Laserfiche WebLink
'MASSMASSXCONSTRUCTIONIIOenbur1gW5A98926CONSTRUCTIONCHANGEORDERPROPOSALCOSTBREAKDOWNPROJECT:ColockumDemolitionCOP#:4CONTRACT:KittitasCountyDATESUBMITTED:7/13/2021WORKDESCRIPTION:COP4-Abandoninplaceanunknownstavepipe,overexcavateasoftspot,softsubgraderequiredanadditonal16.26TNsofHMAtobeplacedandovertimeexpensestoexpeditetheprojectschedule.Overtimechargedpertheattachedratesheet,differenceinOTratesminusregulartimeratesincludedbelow.LABORDESCRIPTIONQ.UANTITYHOURSUNITRATETOTALSuperintendent15$95.00$475.00Laborer10.5$58.81$29.41ExcavatorOperatorJD20015$95.43$477.15ExcavatorOperator305.5Mini10.5$94.72$47.36LaborerOTat1.5x(Fri/Sat)125.5$29.41$749.96DumpTruckDriverOTat1.5x(Fri/Sat)13$34.10$102.30ExcavatorOperator305.5MiniOTat1.5x(Fri/Sat)11.5$47.36$71.04RollerOperatorOTat1.5x(Fri/Sat)11$45.34$45.34GraderOperatorOTat1.5x(Fri/Sat)118$48.13$866.34GraderOperatorOTat2x(Sunday)16$96.26$577.56Subtotal:$3,441.45Markup22%:$757.12TotalLabor:$4,198.57EQUIPMENTDESCRIPTIONQUANTITYHOURSUNITRATETOTALExcavatorJD20015$74.10$370.50JD200HoePack11$35.00$35.00Excavator305.5Mini10.5$45.28$22.64WorkTruckDodge25004x415$10.00$50.00Subtotal:$478.14Markup22%:$105.19TotalEquipment:$583.33MATERIALS,RENTALEQUIPMENT&DUMPFEESDESCRIPTIONQUANTITYUNITUNITRATETOTALCSBC15TN$9.25$138.75Concrete0.5CY$128.35$64.18RentalGrader1LS$1,843.27$1,843.27ECPOpeningFeeSaturday6/26/211DAY$1,500.00$1,500.00Subtotal:$3,546.20Markup22%:$780.16TotalMat'Is,Rentals,Fees:$4,326.36lof2