My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-05-11-minutes-solid-waste-and-maintenance
>
Meetings
>
2021
>
07. July
>
2021-07-20 10:00 AM - Commissioners' Agenda
>
2021-05-11-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2021 12:59:34 PM
Creation date
7/15/2021 12:57:58 PM
Metadata
Fields
Template:
Meeting
Date
7/20/2021
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
78836
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
% <br />try 850 E. SPOKANE FALLS BLVD., SUITE 100 • SPOKANE, WA 99202 • 509.747.3389 • mckinstry.com <br />Life Of Your Building <br />Mechanical Design/Build Proposal for EF -3 Replacement <br />May 4, 2021 <br />Patti Stacey — 509.962.7070 <br />Kittitas County <br />925 Industrial Way <br />Ellensburg, WA 98926 <br />Project: Booking and Cell Negative Pressure Zones <br />Thank you for the opportunity to provide our proposal for this project. McKinstry employs an integrated services <br />model to deliver thousands of building solutions across the Puget Sound. We are excited to apply our experience <br />at developing and executing a variety of projects to address your current needs. We were asked to provide <br />pricing for the Negative Pressure Zones — EF -3 Replacement for the Kittitas County Jail. Below are the project <br />details and our recommendations. <br />REFERENCED DOCUMENTS <br />• EF -3 Nameplate <br />CLARIFICATIONS <br />• All work is based on having free access to the areas within the scope of work. No additional provisions <br />have been included in the budget for multiple mobilizations. Every effort will be made to limit the <br />amount of disruption. <br />Work is to be performed during the following working hours (M -T; 6am-4:30pm) <br />• Proposal is for EF -3 replacement <br />SCOPE OF WORK <br />Our scope of work includes equipment, labor and materials to perform the following work: <br />• EF -3 replacement <br />• Additional ductwork to connect existing ductwork to existing fan curb <br />• Electrical disconnect of old EF -3 and reconnect of new EF -3 <br />EXCLUSIONS <br />• Controls tie-in to existing Allerton system <br />• Motor replacement if needed for new air volumes <br />• Dedicated makeup air unit <br />• Sales, Use and B&O tax <br />• Hazardous materials assessment, removal, or disposal <br />• Any work not specifically noted as included in this proposal <br />CONFIDENTIAL & PROPRIETARY <br />1 <br />GL <br />/e 0/Your Building <br />
The URL can be used to link to this page
Your browser does not support the video tag.