My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2021-114
>
Meetings
>
2021
>
07. July
>
2021-07-06 10:00 AM - Commissioners' Agenda
>
Res-2021-114
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2021 12:41:34 PM
Creation date
7/13/2021 12:41:10 PM
Metadata
Fields
Template:
Meeting
Date
7/6/2021
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
w
Item
Request to Approve a Resolution for the 2021 Distressed County Sales and Use Tax Infrastructure Improvement Program Agreement with the City of Cle Elum
Order
23
Placement
Consent Agenda
Row ID
78209
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF CLE ELUM <br />First Street Downtown Revitalization - Phase 3A Billings Avenue to Oakes Avenue <br />Enginee/s Estlmate <br />u3t2021 <br />HLA Project No. 21010G <br />1!om <br />No.Descriptlon Payment <br />Spoclficetlon Unlt Unlt Cort OYorall <br />quantlly Overrll Co3i <br />1 1-04.4(1)FA $10.o00.o0 1 s10.000.00 <br />PCC Plen 1-07.1 sl,t)LS $500.00 $5m.oo <br />3 LS---F-320.000_00 1 $20,000.00 <br />$20_000-00 <br />5 LS $'t0.000.00 1 s10 ()00 00 <br />6 2-03.5 CY s5t1 (10 5 $4.500.00 <br />4-Oil 5 TON $60.00 s4 aoo oo <br />I )rushed Sudacino oD CouM 4.04.5 TQN $60.00 10 $e00.00 <br />I HMA Cl. 1/2Jnch Pi 64H-28 +04 5 TON s250.00 s6.250.O0 <br />10 l6mSeMrPim ln Diam 7-ia 5 LF 370.00 120 $E.400.00 <br />11 7-05.5 EA $4.500.(x)$4_500.00 <br />1?nlch Bntin TvDe 7-05 5 EA 82.000.00 2 84.O00.O0 <br />13 7-05.5 EA $800 00 4 32.400.00 <br />1A 7{5.5 EA $500.00 4 s2 400.oo <br />t5 t I Pibe tdr l raLr rin I ln Diam 7-{t9.5 LF $120.O0 3 $360.00 <br />t6 Adiusl Velve Box 7-12.5 EA $500.00 3r.000.00 <br />17 eDla6menl 7-14.5 EA $4.500.00 1 s! 500 00 <br />l8 7-15_5 EA $400.o0 $400_00 <br />d6alidn Swlem )6mblele 7-1A 5 LS $12.500.0 t s1? 500 00 <br />20 8{11.5 DAY $150.00 5 s750.00 <br />8{)1.5 EA $70.00 s53() 00 <br />22 Plant Solection -r.lminte M.Dle /2-112" CtliDer)8-02.5 FA s800_00 s2.400.00 <br />ant S.leclion - lr 8{2.5 EA $600.00 31.600.00 <br />24 )lanl Srlrolion - KG l6evi DMod 12 GsllonJ 8-02,5 FA s60.00 48 s? aao oo <br />2A 8{2.5 EA $55.O0 $250.00 <br />26 ,lrnl Sblac{lon -ick Eved Susan 11 Gallonl a-oz 5 EA s30.00 r64 $4,920.00 <br />27 Plant Sclection -bdq Cdmoeci Kinnikinnick (2 Gallonl 8-02.5 EA s35.OO r6 t7.9 t0.00 <br />8-02 5 EA $35.00 sl o50 00 <br />29 8-02.5 (.:Y b80.o0 60 $4.800.00 <br />30 Suborade Toosoil 8-02.5 CY $E0.00 $8 000.00 <br />31 8-02.5 LF s30.00 2 l5 $6.750.00 <br />Root Peth 8-02.5 LF $60.00 $4.500.00 <br />33 aJl? 5 (;Y s125.00 12 $1.500,00 <br />tA Ccmanl Conc. Tra n nrrrh.n.l Griller 8{4.5 LF $50.00 3't3.000.o0 <br />gn5 5 EA 33.500_0 $3.500.00 <br />36 8-O5.5 EA s't 500 00 $3.000.00 <br />a-14 5 SY $80.00 sB 500.oo <br />38 C6menl Conc. Si(Ewelk AJnch Thick Psttrmed 8-14.5 SY $s0.o0 560 $50.400.00 <br />8.14.5 EA $2.000.00 sa ooo.oo <br />40 Soars Condun 1 ln,em Jso€eker WiEl 8-20.5 IF s5.o0 310 $1.860.00 <br />A1 8.20.5 LS $30.000.00 $30.000.o0 <br />42 a-2(l 5 1F S2.1.00 60 $1.440.00 <br />8-21_5 LS $2.000.00 32.000_o0 <br />44 a-?? 5 ls $8.000.00 1 sE.000.00 <br />AsFumotims: <br />1. lncludes south sidewalk ftom Billingo Ave lo Oakes Ave and NW and <br />SW bulbouts at Firsl Str€€l and Oakes Ave intersection. <br />2. Design engineering includes naw spgoifications, crnlract documenls, <br />and ropackagcd plans for reducod project llmlts lrom original Phase 3 <br />"shovol readY'plans. <br />3. Electricel, inigation, illumination, and drainage oxtensions of Phase 2 <br />systems (no additional power servica, inigation polnt of conneclion, <br />etc.). <br />4. N6w crosswalk on w6st leo of Fitsl Street and Oakes A\r€ only, <br />Subtotal <br />Conllngrncy 1o% <br />lllumlnstion Systom (PSE) <br />Total Erumat d Construction Cost <br />$295,860.00 <br />$30,000.00 <br />$5s,000.00 <br />3380,860.00 <br />WSDOT CN F€98 <br />Deslgn Enginccring and Badding Services <br />Construction Engineering 1 570 <br />$2,500.00 <br />060,700.00 <br />$57.100.00 <br />Totel Estlmated Prolect Cost 150r,180.00 <br />G:\PRQJECTS\2021\21OloG\Kittitas County Distressed O.Og\Cost Estlmato Sonlh Slde and Eulbouts - First Street Ph 3 Dountowl Rovllallztlhn.xlsx
The URL can be used to link to this page
Your browser does not support the video tag.