Laserfiche WebLink
downtown area and may reduce the frequency and severity of the 32 auto-related collisions experienced between <br />20t3-2017. <br />The extensiveness of economic development opportunity willnot be achieved without Phase 3A constructibn. <br />3. lndicate lf the project is consistent with the following applicable state, reglonal and local plans and <br />prioritization processes: <br />x Overall Economic Development Plan - Officially Adopted: <br />Yakima and Kittitas Counties Regional Comnrehensive Economic Development Plan 0015,) <br />r Strategy Goals: relates to - Goal oneo Goal two, Goal three, Goal four, Goal five, and Goal six. <br />o Listed as #4 of the l7 Comprehensive Economic Development Strategi (CEDS) projects identified <br />in Kittitas and Yakima Counties combined emphasizing its "importance for:job creation, funding <br />leverage, readiness to proceed, tikelihood ofsuccess, and overall need for the project" (pg 6). <br />x Comprehensive Land Use Plan - Officlally Adopted: June 2019 <br />Kittitas Countp Comprehensive Plan (06/2019.t: Cle Elum Land Use Plan (06/2019.) <br />r Project consistent with multiple goals in Chapter 2, Chapter 3, Chapter 4, Chapter 5, Chapter 6, and <br />Chapter 10. <br />Capital Facility Plan - Officially Adopted: Anril 20{9 <br />Cle EIum Canilal Fqcilities Plan <br />r Project consist with multiple Kittitas County Countywide Planning Policies as listed in Appendix A <br />and Cle Elum goals in multiple infrastructure sections in the Cle Elum Capital Facilities Plan - <br />Transportation Systems, Domestic Water System, Stormwater System, Sanitary Sewer System, <br />Parks and Recreation sections. <br />Community Action Plan (or other communlty-based plan) - Officially Adopted: June 2017 <br />CIe Elum Downtown Plannino - Focus on l"t street Design Concepts <br />. City Council Planning Commission Study Session and Public Forum (2017) AKA "Preferred <br />Alternative." <br />Slx-Year Transportation lmprovement Plans: <br />Cle Elum 2021-2026 Transporlation Improvement Prooram <br />r This project is included in Cle Elum's 2021-2026 Transportation Improvement Program as the <br />City's Number 1 project. <br />Site-speclfic development plans; e.9., Communlty Master Plan: <br />Downlown Association Main Street Sludv 0015): <br />tr Other <br />4, Public Benefit: <br />Please descrlbe the public benefit derived from proJect completion. <br />Conceptual plans and studies have been prepared for Cle Elum's downtown corridor over the past 20 years to <br />improve traffic flow, optimize parking, and build a pedestrian-friendly environment. The latter has always been a <br />focal point to enhance Cle Elum's tourism experience. The plans also addressed the need for improvements to <br />stormwater facilities throughout the City. Past plans and studies continually lost momentum as the City's limited <br />budget restricted possibilities for advancing forward without financial assistance. <br />x <br />X <br />x <br />x <br />6