Laserfiche WebLink
downtown area and may reduce the frequency and severity of the 32 auto -related collisions experienced between <br />2013-2017. <br />The extensiveness of economic development opportunity will not be achieved without Phase 3A construction. <br />3. Indicate if the project is consistent with the following applicable state, regional and local plans and <br />prioritization processes: <br />X Overall Economic Development Plan — Officially Adopted: <br />Yakima and Kittitas Counties Rertonal Comprehensive Economic Development Plan (2015) <br />• Strategy Goals: relates to — Goal one, Goal two, Goal three, Goal four, Goal five, and Goal six. <br />• Listed as 44 of the 17 Comprehensive Economic Development Strategy (CEDS) projects identified <br />in Kittitas and Yakima Counties combined emphasizing its "importance for: job creation, funding <br />leverage, readiness to proceed, likelihood of success, and overall need for the project" (pg 6). <br />X Comprehensive Land Use Plan — Officially Adopted: June 2019 <br />Kiaitas County Comprehensive Plan (06/2019) Cie Elum Land Use Plan (0612019) <br />• Project consistent with multiple goals in Chapter 2, Chapter 3, Chapter 4, Chapter 5, Chapter 6, and <br />Chapter 10. <br />X Capital Facility Plan — Officially Adopted: April 2019 <br />Cie Elum Capital Facilities Plan <br />• Project consist with multiple Kittitas County Countywide Planning Policies as listed in Appendix A <br />and Cie Elum goals in multiple infrastructure sections in the Cie Elum Capital Facilities Plan — <br />Transportation Systems, Domestic Water System, Stormwater System, Sanitary Sewer System, <br />Parks and Recreation sections. <br />X Community Action Plan (or other community-based plan)— Officially Adopted: June 2017 <br />Cle Elum Downtown Planning — Focus on 1" street Design Concepts <br />• City Council Planning Commission Study Session and Public Forum (2017) AKA "Preferred <br />Alternative." <br />X Six -Year Transportation Improvement Plans: <br />Cle Elum 2021-2026 Transportation Improvement Program <br />• This project is included in Cie Elum's 2021-2026 Transportation Improvement Program as the <br />City's Number 1 project. <br />X Site-specific development plans; e.g., Community Master Plan: <br />Downtown Association Main Street Study (2015): <br />❑ Other <br />4. Public Benefit: <br />Please describe the public benefit derived from project completion. <br />Conceptual plans and studies have been prepared for Cie Elum's downtown corridor over the past 20 years to <br />improve traffic flow, optimize parking, and build a pedestrian -friendly environment. The latter has always been a <br />focal point to enhance Cie Elum's tourism experience. The plans also addressed the need for improvements to <br />stormwater facilities throughout the City. Past plans and studies continually lost momentum as the City's limited <br />budget restricted possibilities for advancing forward without financial assistance. <br />