Laserfiche WebLink
Exhibit C SMP Update | 17B.07.030 Permit Exemptions Page 9 of 10 <br />a. Requirements to obtain a Substantial Development Permit, Conditional Use Permit, Variance, letter of exemption; or other review to implement the Shoreline Management Act do not apply to the following: i. Remedial actions. Pursuant to RCW 90.58.355, any person conducting a remedial action at a facility pursuant to a consent decree, order, or agreed order issued pursuant to Chapter 70.105D RCW, or to the Department of Ecology when it conducts a remedial action under Chapter 70.105D. <br />ii. Boatyard improvements to meet NPDES permit requirements. Pursuant to RCW 90.58.355, any person installing site improvements for storm water treatment in an existing boatyard facility to meet requirements of a national pollutant discharge elimination system storm water general permit. <br />iii. WSDOT facility maintenance and safety improvements. Pursuant to RCW 90.58.356, Washington State Department of Transportation projects and activities meeting the conditions of RCW 90.58.356 are not required to obtain a Substantial Development Permit, Conditional Use Permit, Variance, letter of exemption, or other local review. iv. Projects consistent with an environmental excellence program agreement pursuant to RCW 90.58.045. v. Projects authorized through the Energy Facility Site Evaluation Council process, pursuant to Chapter 80.50 RCW. 3.4. Letter of exemption. a. General. A letter of exemption is required for all requests for exemption from a shoreline substantial development permit to ensure the proposal complies with the regulations of this SMP, except for emergency development pursuant to WAC 173-27-040(2)(d) and those uses and developments specifically allowed without a letter of exemption in KCC 17B.05.050(B). b. Application. Any person claiming exemption from the substantial development permit requirements shall submit an application for such an exemption in the manner prescribed by the Shoreline Administrator. Applications shall include, at a minimum: a summary of the proposed development project; identification of the specific exemption provisions from WAC 173-27-040 that applies to the proposal; and a description of how the proposal will comply with the applicable policies and regulations of this Shoreline Master Program. c. Letter of exemption. Kittitas County shall prepare a letter of exemption, addressed to the applicant and the Washington State Department of Ecology, whenever a proposal is determined to be exempt from the substantial development permit requirements. The letter of exemption must indicate the specific exemption provision from WAC 173-27-040 that is applicable to the proposal and provide a summary of the consistency of the proposal with the regulations of this title. d. Watershed restoration projects. This Section applies to a letter of exemption for a watershed restoration project pursuant to WAC 173-27-040 or subject to one or more of the following federal permits: U.S. Army Corps of Engineers Section 10 permit under the Rivers and Harbors Act of 1899 (generally applicable to any project occurring on or over navigable waters); or Section 404 permit under the Federal Water Pollution