My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SMP Ordinance Exhibits
>
Meetings
>
2021
>
05. May
>
2021-05-18 10:00 AM - Commissioners' Agenda
>
SMP Ordinance Exhibits
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2021 12:38:43 PM
Creation date
5/13/2021 12:35:48 PM
Metadata
Fields
Template:
Meeting
Date
5/18/2021
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
e
Item
Request to Approve an Ordinance Concerning the Shoreline Master Program Periodic Review Required by RCW 90.58.080(4)
Order
5
Placement
Consent Agenda
Row ID
76503
Type
Ordinance
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
336
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit C SMP Update | 17B.07.030 Permit Exemptions Page 7 of 10 <br />iii. The County determines that the project is substantially consistent with the Shoreline Master Program. The County shall make such determination in a timely manner and provide it by letter to the project proponent. iv. Fish habitat enhancement projects that conform to the provisions of RCW 77.55.181 are determined to be consistent with local shoreline Master Programs, as follows: a. In order to receive the permit review and approval process created in this <br />Section, a fish habitat enhancement project must meet the criteria under pq.iv(a)(1) and (2) in this subsection: 1. A fish habitat enhancement project must be a project to accomplish one or more of the following tasks: <br />i. Elimination of human-made fish passage barriers, including culvert repair and replacement, and fish passage barrier removal projects that comply with the forest practices rules, as the term “forest practices rules” is defined by RCW 76.09.020; or ii. Restoration of an eroded or unstable stream bank employing the principle of bioengineering, including limited use of rock as a stabilization only at the toe of the bank, and with primary emphasis on using native vegetation to control the erosive forces of flowing water; oror iii. Placement of woody debris or other instream structures that benefit naturally reproducing fish stocks; or iv. The restoration of native kelp and eelgrass beds and restoring native oysters. iii.v. The Washington State Department of Fish and Wildlife shall develop size or scale threshold tests to determine if projects accomplishing any of these tasks should be evaluated under the process created in this Section or under other project review and approval processes. A project proposal shall not be reviewed under the process created in this Section if the Washington State Department of Ecology determines that the scale of the project raises concerns regarding public health and safety.; and 2. A fish habitat enhancement project must be approved in one of the following ways: i. By the Washington State Department of Fish and Wildlife pursuant to RCW Chapter 77.95 or 77.100; ii. By the sponsor of a watershed restoration plan as provided in RCW Chapter 89.08; iii. By the Washington State Department of Ecology as a WDFW-sponsored fish habitat enhancement or restoration project; iv. Through the review and approval process for the Jobs for the Environment Program; v. Through the review and approval process for conservation district-sponsored projects, where the project complies with design
The URL can be used to link to this page
Your browser does not support the video tag.