My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SMP Ordinance Exhibits
>
Meetings
>
2021
>
05. May
>
2021-05-18 10:00 AM - Commissioners' Agenda
>
SMP Ordinance Exhibits
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2021 12:38:43 PM
Creation date
5/13/2021 12:35:48 PM
Metadata
Fields
Template:
Meeting
Date
5/18/2021
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
e
Item
Request to Approve an Ordinance Concerning the Shoreline Master Program Periodic Review Required by RCW 90.58.080(4)
Order
5
Placement
Consent Agenda
Row ID
76503
Type
Ordinance
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
336
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Kittitas County Shoreline Master Program <br />Chapter 7 156 <br />March 7, 2016 <br />any appeal rights. A local government may accept public comments at any <br />time prior to the closing of the record of an open record pre -decision <br />hearing, if any, or, if no open record pre-decision hearing is provided, prior <br />to the decision on the project permit; <br />vi. The date, time, place, and type of hearing, if applicable and scheduled at <br />the date of notice of the application; <br />vii. A statement of the preliminary determination, if one has been made at the <br />time of notice, of those development regulations that will be used for project <br />mitigation and of consistency; and <br />viii. Any other information determined appropriate by the local government. <br /> <br />e. Method. The notification system shall assure that notice to the general public <br />and property owners in the vicinity of such application is given by at least one of <br />the following methods: <br />i. Mailing of the notice to the latest recorded real property owners as shown <br />by the records of the county assessor within at least five hundred (500) feet <br />of the boundary of the property upon which the use or development is <br />proposed; or <br />ii. Posting of the notice in a conspicuous manner on the property upon which <br />the project is to be undertaken. <br /> <br />5. Review and decision. The appropriate review authority identified in Section 7.5 shall <br />review applications for compliance with review criteria in Section 7.6 and either <br />approve, deny, or approve with conditions. In the case of shoreline conditional use <br />and variance permits, the decision shall serve as a recommendation to the <br />Washington State Department of Ecology, which is responsible for the final decision <br />on shoreline conditional use permits and variances. <br /> <br />6. Submittal to the Washington State Department of Ecology: <br />a. Required submittal. All applications for a permit or a permit revision shall be <br />submitted to the Washington State Department of Ecology upon a final decision <br />by local government, pursuant to WAC 173 -27-130. <br />b. Modified project. When the project has been modified in the course of the review <br />proceeding, plans or text shall be provided to the local government that clear ly <br />indicate the final approved plan, and the local government shall reissue the <br />permit accordingly and submit a copy of the reissued permit and supporting <br />documents consistent with Section 7.7.6 to the Washington State Department of <br />Ecology for completion of the file on the permit. The purpose of this provision is <br />to assure that the local and Ecology files on the permit are complete and <br />accurate and not to provide a new opportunity for appeal of the permit. <br />c. Conditional use permits and variances. Shoreline Conditional Use Permits and <br />Variances shall be transmitted to the Washington State Department of Ecology <br />for final approval, denial, or approval with conditions. <br />a. After all local permit administrative appeals or reconsideration periods are <br />complete, and the permit documents amended to incorporate any resulting
The URL can be used to link to this page
Your browser does not support the video tag.