My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SMP Ordinance Exhibits
>
Meetings
>
2021
>
05. May
>
2021-05-18 10:00 AM - Commissioners' Agenda
>
SMP Ordinance Exhibits
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2021 12:38:43 PM
Creation date
5/13/2021 12:35:48 PM
Metadata
Fields
Template:
Meeting
Date
5/18/2021
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
e
Item
Request to Approve an Ordinance Concerning the Shoreline Master Program Periodic Review Required by RCW 90.58.080(4)
Order
5
Placement
Consent Agenda
Row ID
76503
Type
Ordinance
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
336
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Kittitas County Shoreline Master Program <br />Chapter 7 146 <br />March 7, 2016 <br />RCW Chapter 43.21C, the state Environmental Policy Act. <br /> <br />p. The external or internal retrofitting of an existing structure with the exclusive <br />purpose of compliance with the Americans with Disabilities Act of 1990 (42 <br />U.S.C. Sec. 12101 et seq.) or to otherwise provide physical access to the <br />structure by individuals with disabilities. <br /> <br />o.q. A public or private project that is designed to improve fish or wildlife habitat or <br />fish passage, when all of the following apply: <br />i. The project has been approved in writing by the Washington State Department <br />of Fish and Wildlife; <br />ii. The project has received hydraulic project approval by the Washington State <br />Department of Fish and Wildlife pursuant to RCW Chapter 77.55; and <br />iii. The County determines that the project is substantially consistent with the <br />Shoreline Master Program. The County shall make such determination in a <br />timely manner and provide it by letter to the project proponent. <br />iv. Fish habitat enhancement projects that conform to the provisions of RCW <br />77.55.181 are determined to be consistent with local shoreline Master <br />Programs, as follows: <br />(a) In order to receive the permit review and approval process created in this <br />Section, a fish habitat enhancement project must meet the criteria under <br />p.iv(a)(1) and (2) of this subsection: <br />(1) A fish habitat enhancement project must be a project to accomplish <br />one or more of the following tasks: <br />(i) Elimination of human-made fish passage barriers, including <br />culvert repair and replacement, and fish passage barrier <br />removal projects that comply with the forest practices rules, as <br />the term “forest practices rules” is defined by RCW 76.09.020; <br />or ; <br />(ii) Restoration of an eroded or unstable stream bank employing <br />the principle of bioengineering, including limited use of rock as a <br />stabilization only at the toe of the bank, and with primary <br />emphasis on using native vegetation to control the erosive <br />forces of flowing water; or <br />(iii) Placement of woody debris or other instream structures that <br />benefit naturally reproducing fish stocks. <br /> The restoration of native kelp and eelgrass beds and restoring <br />native oysters. <br />(iii)(iv) The Washington State Department of Fish and Wildlife shall <br />develop size or scale threshold tests to determine if projects <br />accomplishing any of these tasks should be evaluated under the <br />process created in this Section or under other project review <br />and approval processes. A project proposal shall not be <br />reviewed under the process created in this Section if the
The URL can be used to link to this page
Your browser does not support the video tag.