My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_AmendedInterlocal_FCZD and City of Ellensburg
>
Meetings
>
2021
>
05. May
>
2021-05-18 10:00 AM - Commissioners' Agenda
>
Resolution_AmendedInterlocal_FCZD and City of Ellensburg
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2021 12:37:35 PM
Creation date
5/13/2021 12:35:10 PM
Metadata
Fields
Template:
Meeting
Date
5/18/2021
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
i
Item
Request to Approve a Resolution to Authorize the Chair's Signature on an Amended Interlocal Agreement between Kittitas County Flood Control Zone District and the City of Ellensburg
Order
9
Placement
Consent Agenda
Row ID
76503
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 1 to Amendment 2 — Scope of Work <br />Amendment 2 Task 2: Prepare Final Design Package and Bidding Documents for <br />Lower Levee to 1-90 Bridge Connection <br />Aspect will develop a Final Design Package for the lower levee to 1-90 bridge connection. <br />Aspect's Task 2 services include: <br />2.1 Refine and update prior hydraulic and drainage calculations as needed during the final <br />design process. <br />2.2 Prepare final revised Design Package for the lower levee to 1-90 bridge connection. <br />2.3 Prepare final project specifications and special provisions. <br />2A Prepare final materials quantities and construction cost estimate. <br />2,5 Prepare a final project bid schedule. <br />2.6 Complete internal QAIQC review and submit the Final Design Package to the City <br />aridlor County for use in contracting the construction work. These plans will also be <br />included in the County's CLOMR package to FEMA. <br />Task 2 Deliverables <br />Lower Levee to 1-90 Bridge Connection Final Design Package (PDF format): <br />- Topographical bassmap and final design and TESC on I V x 17" plan sheets. <br />- Final standard details and specifications. <br />- Final special provisions and specifications. <br />Final engineers estimate of probable project cost. <br />- Final bid schedule. <br />Task 2 Assumptions <br />Only minor changes due to comments on the 90% design package (no new or significant <br />re -work). <br />No major utility conflicts requiring significant utility relocation design effort, <br />• No final design review cycle by the City or County. <br />• No permitting support. <br />Amendment 2 Task 3., Prepare Levee Technical Report to Support Certification <br />and CLOMR Process <br />Aspect will complete analyses and prepare an overall Levee Technical Report to support the <br />CLOMR and levee certification process. Aspect's Task 3 services include: <br />3.1 Coordinating with WSE during completion of technical analyses. <br />3.2 Completing a field visit to review conditions and identify key levee segments for <br />detailed analyses. <br />3.3 Completing technical analyses (hydraulic, scour, stability, seepage, settling, interior <br />drainage) for key sections of the existing and proposed levee. <br />3.4 Preparing an overall draft Levee Technical Report to support the CLOMR and levee <br />certification process. The report will address items a though a mentioned earlier, and is <br />Reecer Creek Floodplain Mapping and Levee Certification Support Services Project 4 1 Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.