Laserfiche WebLink
Exhibit E-2 <br />CHUDGAR ENGINEERING <br />Consultant Fee Summary <br />Not -to -Exceed Fee Consultant Agreement <br />KITTITAS COUNTY THORP TRUSS REHABILITATION PROJECT <br />Classification: <br />Principal Structural Enaineer <br />Senior Structural Engineer <br />Structural Design Engineer <br />Structural Design Engineer <br />Structural Design Engineer <br />Title 6 <br />Title 7 <br />Title 8 <br />Title 9 <br />Title 10 <br />Title 11 <br />Title 12 <br />Title 13 <br />Title 14 <br />Title 15 <br />Title 16 <br />Title 17 <br />Title 18 <br />Title 19 <br />Title 20 <br />Overhead (OH) Cost <br />OH Rate x DSC of <br />Fixed Fee (FF) <br />FF Rate x DSC of <br />Reimbursable Items <br />Mileage <br />Airfare <br />Per Diem <br />Subcontract <br />(Blank) <br />Total Hours X <br />14.00 X <br />24,00 X <br />80.00 X <br />8.00 X <br />SAO <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />Rate <br />$ 105.00 <br />$ <br />53.42 <br />$ <br />37.81 <br />$ <br />35.50 <br />$ <br />36.36 <br />_ $ <br />284.00 <br />_ $ <br />290.88 <br />= <br />Cost <br />_ $ <br />1,470.00 <br />$ <br />1,282.08 <br />_ $ <br />3,024.80 <br />_ $ <br />284.00 <br />_ $ <br />290.88 <br />Total Direct Labor $ 6,351.76 <br />110.00% X $6,351.76 = $ 6,986.94. <br />30.00% X $6,351.76 = $ 1,905.53 <br />Direct Labor Subtotal $ 15,244.22 <br />(## Miles x $0.56/mile) <br />$ - <br />(Allowance) <br />$ - <br />(Hotei + Meals @ $#.## x # trips) <br />$ - <br />(Sub Name & Task) <br />$ - <br />(Allowance) <br />$ - <br />Subtotal <br />$ - <br />GRAND TOTAL: $16,244.22 <br />