My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-04-12-minutes-public-works-study-session
>
Meetings
>
2021
>
05. May
>
2021-05-04 10:00 AM - Commissioners' Agenda
>
2021-04-12-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2021 1:01:30 PM
Creation date
4/29/2021 12:54:27 PM
Metadata
Fields
Template:
Meeting
Date
5/4/2021
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
75943
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
$2.5197 unleaded $2.7213 mid <br />IA1 <br />Petroleum and Lubricant Products for 2018 <br />leaded $2.6822 premleaded $2.9227 <br />Petroleum <br />1/16/2018 <br />RES #2018-012 <br />Schedule A <br />Ethanal tree $2.7213 Ethanol free mid <br />$2.4427 Diesel <br />I. <br />Petroleum and Lubricant Products for 2018 <br />Amerifuel <br />$2.3939 un leaded $2.6338 mid leaded <br />16/2018 <br />RES #2018-012 <br />Schedule 6 <br />$1.2883 Diesel <br />Petroleum and Lubricant Products for 2018 s <br />Al Petroleum <br />$24,742.05 <br />1/16/2018 <br />RES 42018-012 ; <br />Schedule C <br />10/17/2017 <br />RES #2017-170 <br />6eotechnicel, Environment, Hydraulic and <br />Jacobs Engineering Group Inc. <br />$327,$53.00 Maximum Amour <br />ReaLEstate Services ............ <br />Pa able <br />Manastash Creek Bridge Replacement - <br />Jacobs Engineering Group Inc. <br />1$279,603,00 Maximum Amount <br />1Payable <br />8/15/2017 <br />RES #12017-136 <br />Resign of replacement structure <br />Comprehensive Plan <br />Jacobs Engineering Group Inc. <br />$111,850.00 Maximum Amount <br />3/8/2017 <br />RES #2017-050 <br />ransportation Element <br />Payable <br />599,259.00 Maximum Amount <br />�! <br />" <br />gs - All Kittltas County Bridges <br />FNge <br />r <br />EKcPFF Consufting Engineers <br />16/20/2017 <br />� <br />RES#2017-101 <br />Pa able <br />Design ��KPFF <br />Consulting Engineers <br />$87,504.00 Maximum Amount <br />Payable ........_._.. <br />7/18/2017 <br />RES #2017-115 <br />
The URL can be used to link to this page
Your browser does not support the video tag.