My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2021-059 Award Bid
>
Meetings
>
2021
>
04. April
>
2021-04-20 10:00 AM - Commissioners' Agenda
>
Res-2021-059 Award Bid
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2021 1:36:22 PM
Creation date
4/22/2021 1:35:45 PM
Metadata
Fields
Template:
Meeting
Date
4/20/2021
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
d
Item
Request to Approve a Resolution to Award Bid on the Phase 1 Road and Utility Improvements for the New transfer Station Location
Order
4
Placement
Consent Agenda
Row ID
75326
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADDENDUM NO. 04 <br />ATTACFIMENT NO. 04 <br />util Schedule <br />is certifies that the undersigned has thoroughly examined the location of: <br />COUNTY TRANSFER STATION, PHASE 1 . ROAD AND UTILITY IMPROVEMENTS <br />Specifications, and Contract, and the following Bid Proposal Schedule of Rates and Prices: <br />(unit prices for all items, all extensions, and total amount of bid, shall be shown) <br />dn thethat Pla ns,and Contract workthe emSpecifications,braced thistn nda thethat methodgoverning whichmprovementby <br />will madebe saidfor rswork understood.The undertaketo na dundersigned worktheherebyproposescomplete <br />thtn tmls mor muchasprovement,asthereof becan leted thewith accordatn withnce saidcompavailable,money <br />Kittitas County Courthouse <br />205 West Sth Street <br />Ellensburg, WA 98926 <br />Item No.Plan <br />Quantitv Unit Item Description Unit Price Total <br />Amount <br />PREPARATION <br />1 &00 L.S. <br />825.00 L.F PVC SANITARY <br />TION <br />&WATER LINES <br />IN. DIAM <br />3 2595.00 L.F.PVC SANITARYSEWER PIPE 1O IN. DIAM <br />4 1845.00 L.F.DUCTILE IRON PIPE FOR WATER MAIN 8IN. DIAM.$ 6i.oo <br />5 5.00 EACH BUTTERFLYVALVE lO IN g 2.obo.@ lc ,9@,@ <br />6 2.O0 EACH COMB. AIR RELEASE/AIR VACUUM VALVE ASSEMBLY 2 IN.; t.'l$oteE.$'2.5m^ec <br />7 1.00 EACH BLOWOFF ASSEMBLY ', 2.lLO,oo $ 2.lzo,oo <br />8 8.00 EACH HYDRANT ASSEMBLY ; 't toa.oo t.W,&I 2580.00 L.F DUCTILE IRON PIPE FOR WATER MAIN 10 IN. DIAM.$ 74'Q $ fio.qao.ot <br />10 8.00 EACH GATE VALVE 8 IN.$ l,65O,O0 <br />NG <br />oo <br />15.00 <br />1600 <br />MANHOLE 48IN <br />CONTROL AND <br />HIGH VISIBILI <br />TRAFFIC <br />13 6180.00 L.F.CONDUIT PIPE2IN. DIAM.g to.oo <br />14 6180.00 L.F CONDUIT PIPE 4IN. DIAM tq.w $ *,9b,a <br />15 6180.00 L.F CONDUIT PIPE 6IN, DIAM.$ zt.oD 2 <br />16 1.00 L.S-PROJECT TEMPORARY TRAFFIC CONTROL <br />16b 1.00 EACH VAULT CONC. 6'x12', SPEC VP612 r1-11.{@,Al <br />16c 4.00 EACH VAULICONC. 7'x7', SPEC VP77 S Q.?a,e i!. <br />16d 7-00 EACH VAULT CONC. 5'x7', SPEC VP57 i lLoaOo $l o,q@,e <br />16e .00 EACH <br />OTHER ITEMS <br />LASS VAULT <br />17 34360.00 S.F.SHORING ATION CLASS B $ o.50 <br />18 1.00 L.S ROA NG s Ll,w,e 8 -r.|,@.b <br />18b 12000.00 c.Y EXCAVATION S .Leo Stl <br />Roa Schedule <br />Item No.Unit Price <br />19 MOBIL <br />Unit <br />1 <br />Item Description <br />PREP <br />Total <br />Amount <br />Plan <br />Quantity <br />20 8.00 ACRE CLEARING AND GRUBBING $ b.o@,o $ il8ooo.oo <br />22 <br />1.00 L.S <br />GRADING STOC <br />NCL.HAUL <br />MOVAL OF D OBSTRUCTIONS <br />23 8100.00 c.Y 8roL,J@]COMMON BORROW INCL. HAUL 21.oo <br />24 3070.00 c.Y DITCH EXCAVATION INCL. HAUL I tb.@ $ .adl .t20,l
The URL can be used to link to this page
Your browser does not support the video tag.