Laserfiche WebLink
19ffi lAqlff€vrAqng-,(n'. r i,r)r-ci", <br />Local Agency Address <br />4 a* \rrdustrp"l t't"li"i'1 <br />?{ I *rs\nrrrq, r.DtA 4?-ii J r," <br />Project t,tame H <br />Local Agency Subcontractor List <br />Prepared in compliance with RCW 39.W.060 as amended <br />To Be Submitted with the Bid Proposal <br />S\ <br />Fallure to list subcontractors with whom the bidder, lf awarded the contract, will dlrectly subcontract for performance of the <br />work of structural steel installation, rebar installation, heating, ventilation and air conditioning, plumbing, as described in <br />Chapter 18.106 RCW and electrical, as described in Chapter 19.28 RCW or naming more than one subcontractor to perform <br />the same work will result in your bid being non-responsive and therefore void. <br />Subcontracto(s) with whom the bidder will directly subcontract that are proposed to perform the work of structural steel installation, <br />rebar installation, heating, ventilation and air conditioning, plumbing, as described in Chapter 18.106 RCW, and eledrical as <br />described in Chapter 19,28 RCW must be listed below. The work to be performed is to be listed below the subcontractor(s) name. <br />To the extent the Project includes one or more categories of work referenced in RGW 39.30,060, and no subcontractor is <br />listed below to perform such work, the bidder certifies that the work will either (i) be performed by the bldder itself, or (ii) be <br />performed by a lower tier subcontractor who will not contract directly with the bidder. <br />Subcontractor Name <br />Work to be performed <br />Subcontractor Name <br />Work to be performed <br />Subcontractor Name <br />Work to be performed <br />Subcontractor Name <br />Work to be performed <br />Subcontractor Name <br />Work to be performed <br />* Bidder's are notified that it is the opinion of the enforcement agency that PVC or metal conduit, junction boxes, etc, are considered <br />electrical equipment and therefore considered part of electrical work, even if the installation is for future use and no wiring or electrical <br />current is connected during the project. <br />DOT Form 271-0154 <br />Revised 0612020