My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2021-059 Award Bid
>
Meetings
>
2021
>
04. April
>
2021-04-20 10:00 AM - Commissioners' Agenda
>
Res-2021-059 Award Bid
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2021 1:36:22 PM
Creation date
4/22/2021 1:35:45 PM
Metadata
Fields
Template:
Meeting
Date
4/20/2021
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
d
Item
Request to Approve a Resolution to Award Bid on the Phase 1 Road and Utility Improvements for the New transfer Station Location
Order
4
Placement
Consent Agenda
Row ID
75326
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19ffi lAqlff€vrAqng-,(n'. r i,r)r-ci", <br />Local Agency Address <br />4 a* \rrdustrp"l t't"li"i'1 <br />?{ I *rs\nrrrq, r.DtA 4?-ii J r," <br />Project t,tame H <br />Local Agency Subcontractor List <br />Prepared in compliance with RCW 39.W.060 as amended <br />To Be Submitted with the Bid Proposal <br />S\ <br />Fallure to list subcontractors with whom the bidder, lf awarded the contract, will dlrectly subcontract for performance of the <br />work of structural steel installation, rebar installation, heating, ventilation and air conditioning, plumbing, as described in <br />Chapter 18.106 RCW and electrical, as described in Chapter 19.28 RCW or naming more than one subcontractor to perform <br />the same work will result in your bid being non-responsive and therefore void. <br />Subcontracto(s) with whom the bidder will directly subcontract that are proposed to perform the work of structural steel installation, <br />rebar installation, heating, ventilation and air conditioning, plumbing, as described in Chapter 18.106 RCW, and eledrical as <br />described in Chapter 19,28 RCW must be listed below. The work to be performed is to be listed below the subcontractor(s) name. <br />To the extent the Project includes one or more categories of work referenced in RGW 39.30,060, and no subcontractor is <br />listed below to perform such work, the bidder certifies that the work will either (i) be performed by the bldder itself, or (ii) be <br />performed by a lower tier subcontractor who will not contract directly with the bidder. <br />Subcontractor Name <br />Work to be performed <br />Subcontractor Name <br />Work to be performed <br />Subcontractor Name <br />Work to be performed <br />Subcontractor Name <br />Work to be performed <br />Subcontractor Name <br />Work to be performed <br />* Bidder's are notified that it is the opinion of the enforcement agency that PVC or metal conduit, junction boxes, etc, are considered <br />electrical equipment and therefore considered part of electrical work, even if the installation is for future use and no wiring or electrical <br />current is connected during the project. <br />DOT Form 271-0154 <br />Revised 0612020
The URL can be used to link to this page
Your browser does not support the video tag.