Laserfiche WebLink
24 <br /> <br />Priority 6: Huntzinger Rd. Safety Improvements <br /> <br />• Phase 1 is between MP 2.70 to MP 4.88 has several horizontal curves, steep embankments, and no <br />shoulder in places with minimal countermeasures in place. <br />o ESTIMATED COST $778,557 <br />• Phase 2 is between MP 5.14 to MP 6.99 where there are steep embankments, no shoulder in areas and <br />need of guardrail, signs and/or delineation. <br />o ESTIMATED COST $366,129 <br />• Phase 3 is between MP 6.99 to MP 10.74 with sharp horizontal curves, vertical curves, steep embankments, <br />very little to no shoulder and inadequate clear zone. <br />o ESTIMATED COST $586,638 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />