Laserfiche WebLink
16 <br /> <br />Priority 2: Bridge Rail Improvements <br />Code 3 <br /> <br />• Phase 1 is within County Maintenance Districts A-F with 19 bridges or structures. <br />o ESTIMATED COST $655,213 <br />• Phase 2 is within County Maintenance District G-I with 21 bridges or structures. <br />o ESTIMATED COST $617,553 <br />• Phase 3 is within County Maintenance Districts J-L with 20 bridges or structures. <br />o ESTIMATED COST $695,379 <br /> <br />• Bridges that have been coded 3 <br />are severely inadequate bridges or <br />structures with wood rail or no rail <br />at all. <br />• There will be three projects by <br />geographic location of code 3 <br />bridges to allow for manageable <br />and cost-conscious improvements. <br />