Laserfiche WebLink
Priority 5: Bridge Rall Improvements <br />Code 1 <br />kld9�R�{: i[lXWRMl� <br />C 914:N� Rwd• IR Wipl G�hN� <br />Un�igr iwil{�i <br />— 6[d1Y i <br />-�OLMOW e <br />C <br />�OlIIfM WWR G <br />�LRl1f <br />• Phase 1 is within County Maintenance Districts A -D with 2 bridges or structures. <br />o ESTIMATED COST $478,583 <br />• Phase 2 is within County Maintenance District E with 1 bridge or structures. <br />o ESTIMATED COST $1,063,507 <br />• Phase 3 is within County Maintenance District F -L with 17 bridges or structures. <br />o ESTIMATED COST $518,192 <br />• These bridges or structures will need upgraded rail and approaches to be brought up to standards to <br />prevent serious injury or fatality accidents if collision should occur. <br />22 <br />