Laserfiche WebLink
A <br />Priority 2: Bridge Rail Improvements <br />Code 3 <br />L <br />• :naefq' <br />— LLELCJ6 ■ <br />�:ti-Y V,Y.JT O t <br />—RX.vi • L <br />Phase 1 is within County Maintenance Districts A -F with 19 bridges or structures. <br />o ESTIMATED COST $655,213 <br />Phase 2 is within County Maintenance District G-1 with 21 bridges or structures. <br />o ESTIMATED COST $617,553 <br />Phase 3 is within County Maintenance Districts J -L with 20 bridges or structures. <br />o ESTIMATED COST $695,379 <br />Bridges that have been coded 3 <br />are severely inadequate bridges or <br />structures with wood rail or no rail <br />at all. <br />There will be three projects by <br />geographic location of code 3 <br />bridges to allow for manageable <br />and cost-conscious improvements. <br />16 <br />