My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_Prospectus Vantage Highway
>
Meetings
>
2021
>
04. April
>
2021-04-06 10:00 AM - Commissioners' Agenda
>
Resolution_Prospectus Vantage Highway
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2021 12:44:27 PM
Creation date
4/1/2021 12:44:19 PM
Metadata
Fields
Template:
Meeting
Date
4/6/2021
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
v
Item
Request to Approve a Resolution Authorizing the Chair's Signature on the Local Agency Federal Aid Project Prospectus for the Vantage Highway Project, CRP 298-19
Order
22
Placement
Consent Agenda
Row ID
74277
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency Project Title Date <br />Kittitas County Vantage Highway March 25, 2021 <br />Right of Way <br />❑✓ No Right of Way Needed <br />❑ Right of Way Needed <br />All construction required by the <br />❑ No Relocation ❑ Relocation Required <br />contract can be accomplished <br />within the exiting right of way. <br />Utilities <br />Railroad <br />❑ No utility work required[,/1 <br />No railroad work required <br />❑✓ All utility work will be completed prior to the start <br />❑ All railroad work will be completed prior to the start of <br />of the construction contract <br />the construction contract <br />❑ All utility work will be completed in coordination <br />❑AII the railroad work will be completed in coordination <br />with the construction contract <br />with the construction contract <br />Description of Utility Relocation orAdjustments and Existing Major Structures Involved in the Project <br />Three power poles were permanently relocated by the utility company during the design phase to get them <br />outside of the clear zone. <br />FAA Involvement <br />Is any airport located within 3.2 kilometers (2 miles) of the proposed project? []Yes ❑✓ No <br />designee, and is not inconsistent with the agency's comprehensive plan for community development. <br />Agency <br />Date By <br />Mayor/Chairperson <br />DOT Form 140-101 Page 3 <br />Revised 04/2015 Previous Editions Obsolete <br />
The URL can be used to link to this page
Your browser does not support the video tag.