Laserfiche WebLink
Agency Project Title Date <br />Kittitas County Vantage Highway March 25, 2021 <br />Right of Way <br />❑✓ No Right of Way Needed <br />❑ Right of Way Needed <br />All construction required by the <br />❑ No Relocation ❑ Relocation Required <br />contract can be accomplished <br />within the exiting right of way. <br />Utilities <br />Railroad <br />❑ No utility work required[,/1 <br />No railroad work required <br />❑✓ All utility work will be completed prior to the start <br />❑ All railroad work will be completed prior to the start of <br />of the construction contract <br />the construction contract <br />❑ All utility work will be completed in coordination <br />❑AII the railroad work will be completed in coordination <br />with the construction contract <br />with the construction contract <br />Description of Utility Relocation orAdjustments and Existing Major Structures Involved in the Project <br />Three power poles were permanently relocated by the utility company during the design phase to get them <br />outside of the clear zone. <br />FAA Involvement <br />Is any airport located within 3.2 kilometers (2 miles) of the proposed project? []Yes ❑✓ No <br />designee, and is not inconsistent with the agency's comprehensive plan for community development. <br />Agency <br />Date By <br />Mayor/Chairperson <br />DOT Form 140-101 Page 3 <br />Revised 04/2015 Previous Editions Obsolete <br />