Laserfiche WebLink
Ginkgo State Park Parking Lot <br />MIP N/A TO PROJECT LENGTH N/A <br />UTIO21 Days <br />SCOPING ESTIMATE $130,8S1 ;ONSTRUCTION CREATED: 3/12/2021 By: C. CURTIS <br />Construction of parking lot improvements at Ginko State Park consisting of drainage improvments, grading, aspahlt paving and stripping. Phase 1 design costs <br />are estimate at $10,996. Phase 2 costs are estmated at $119,855. <br />QUANT. <br />UNIT <br />ITEM NO. <br />ITEM <br />UNIT PRICE <br />AMOUNT <br />PREPARATION <br />1 <br />L.S. <br />0001 <br />MOBILIZATION <br />10% <br />$9,088 <br />1 <br />L.S. <br />0050 <br />REMOVAL OF STRUCTURES AND OBSTRUCTIONS <br />$1,000.00 <br />$1,000 <br />DRAINAGE <br />250 <br />C.Y. <br />1030 <br />DITCH EXCAVATION <br />$14.00 <br />$3,500 <br />80 <br />L.F. <br />3567 <br />HIGH-DENSITY POLYPROPYLENE (HDPE) PIPE 18 IN. DIAM <br />$90.00 <br />$7,200 <br />1 <br />EACH <br />3091 <br />CATCH BASIN TYPE 1 <br />$1,450.00 <br />$1,450 <br />SURFACING <br />460 <br />C.V. <br />5095 <br />CRUSHED SURFACING BASE COURSE <br />$35.00 <br />$16,100 <br />HOT MIX ASPHALT <br />450 <br />TON <br />5767 <br />HMA CL. 1/2 IN. PG 64-28 <br />$135.00 <br />$60,750 <br />TRAFFIC <br />700 <br />L.F. <br />6806 <br />PAINT LINE <br />$1.25 <br />$875 <br />PROJECT CHANGE TRACKING I BID ITEM SUBTOTAL WIO MOBILIZATION <br />$90,875 <br />3/17/2021 MC Added detail for interlocal agreement exhibit inclusion <br />DESIGN ALLOCATIONS 10.00° <br />BID ITEM TOTAL <br />SALES TAX @ 0.00 <br />PROJECT SUBTOTAL <br />CONSTRUCTION ENGINEERING @ 5 <br />CONTINGENCIES @ 4% <br />CN ESTIMATE <br />PE PHASE 10% <br />$0 <br />$109,959 <br />$5,498 <br />$4,398 <br />$119,855 <br />10,996 <br />