My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-03-22-minutes-public-works-study-session
>
Meetings
>
2021
>
04. April
>
2021-04-06 10:00 AM - Commissioners' Agenda
>
2021-03-22-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2021 12:42:51 PM
Creation date
4/1/2021 12:42:16 PM
Metadata
Fields
Template:
Meeting
Date
4/6/2021
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
74277
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Po�T. °"""""S T"T"`���y6 KZTTZTAiS COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />wimps MUu Mark R. Cook, PE Director <br />EXHIBIT A <br />SCOPE OF WORK <br />Ginkgo State Park Parkin¢ Lot Improvement <br />Vantage Highway Milepost 25.75 <br />Washington State Parks (STATE) desires to make improvements to their parking lot serving <br />Ginkgo State Park adjacent to Vantage Highway. The parking lot is located at approximate <br />milepost 25.75 on the north side of Vantage Highway. The parking lot is currently gravel with <br />one access at the eastern side, a solar powered charging station and pit toilet are also on the site. <br />The project is to be completed in two phases. Phase I includes engineering and design of the <br />parking lot improvement. Phase II is construction support of said improvements. Phase II will be <br />authorized by Washington State Parks providing work can be completed by June 30, 2021. <br />Kittitas County Public Works (KCPW), shall provide professional services to the Washington <br />State Parks for the Ginkgo State Park Parking Lot Improvement project (PROJECT) as outlined <br />in the Work Task descriptions below. The following general provisions/assumptions have been <br />made: <br />A. Work conducted will meet STATE design standards. <br />B. It is anticipated that one (1) bid package including plans and estimate will be prepared for <br />all elements of the PROJECT. <br />C. Specifications for construction will use Washington Department of Transportation <br />Standard Specifications for Road, Bridge, and Municipal Construction 2021. <br />D. Project specific specifications are not anticipated. <br />E. All necessary permits will be obtained by STATE <br />F. The STATE shall pay all fees for permitting, advertising or other associated fees <br />necessary for the PROJECT. <br />G. No federal funds shall be used in design or construction of the PROJECT. <br />H. All calculations, analyses, design, plans, specifications, and other project work will be <br />prepared in English units. The use of metric units for any aspect of the work will not be <br />required. <br />I. It is understood and agreed that tasks may be added or deleted from the scope of services <br />by mutual agreement between the STATE and KCPW. <br />J. Construction is to be completed by KCPW. <br />Kittitas County Public Works agrees to perform the following services: <br />ENGINEERING DESIGN, PLANS, ESTIMATE AND CONSTRUCTION SUPPORT <br />411 N. Ruby St, Suite #1 TEL (509) 962-7523 <br />Ellensburg, WA 98926 FAX (509) 962-7663 <br />
The URL can be used to link to this page
Your browser does not support the video tag.