My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-03-22-minutes-public-works-study-session
>
Meetings
>
2021
>
04. April
>
2021-04-06 10:00 AM - Commissioners' Agenda
>
2021-03-22-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2021 12:42:51 PM
Creation date
4/1/2021 12:42:16 PM
Metadata
Fields
Template:
Meeting
Date
4/6/2021
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
74277
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS <br />STUDY SESSION STAFF REPORT <br />STUDY SESSION DATE: March 22, 2021 <br />TOPIC: Interlocal Agreement with State Parks — Ginko Parking Lot Improvement <br />Design and Construction <br />ACTION REQUESTED: Direct Staff Prepare Enabling Documents <br />LEAD STAFF: <br />Mark R. Cook <br />RECOMMENDATION: <br />Direct staff prepare enabling documents for Board consideration. <br />BRIEFING SUMMARY: <br />• State Parks is requesting Public Works (PW) design parking lot improvements to <br />Ginko State Park and administer construction of the project. <br />• PW is preparing to improve Vantage Highway in front of Ginko. <br />• Vantage Highway improvements are anticipated to have some impact on the <br />existing parking lot. <br />• This is a unique opportunity to improve the parking lot in conjunction with our <br />Vantage Highway improvement project. <br />• A draft interlocal agreement is attached as EXHIBIT 1. <br />BACKGROUND: <br />PW is improving Vantage Highway from Vantage to the top of the grade. The entrance <br />to Ginko State Park will likely be impacted by PW improvements to Vantage Highway. <br />State Parks has desired improvements to the existing parking lot for some time and is <br />now requesting design and construction support. <br />DISCUSSION: <br />Improvements to Ginko State Park will facilitate better traffic circulation and allow for <br />improvements to stormwater discharges from the existing parking lot. PW has the <br />expertise and capacity to support parking lot design and construction services at Ginko <br />State Park that will complement our current scheduled improvements to Vantage <br />Highway. <br />FISCAL IMPACTS: <br />PW will obtain cost recovery from State Parks for parking lot design efforts. Total <br />design and construction services are estimated to cost $130,411. <br />Page 1 of 4 <br />Public Works "Work Session Staff Report", 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.