Laserfiche WebLink
TASK 5 - MANAGEMENT RESERVE <br />This task will be a management reserve budget to be used upon specific request by the Client. The <br />management reserve may be used for Client directed changes, modifications, or additional work items <br />not covered by the existing budget. <br />PROJECT LIM ITATIONS AND ASSU MPTIONS <br />This proposal does not include the following but may be added by contract amendment: <br />1. Easements <br />2. KCCD or EWC to provide backhoe excavated test pits <br />3. Kittitas County bridge or roadway modifications <br />4. lndividual irrigation system improvements <br />5. Major creek realignment or modifications outside of the current design <br />6. Hydrology modeling and flood routing <br />7. Bidding and construction administration assistance <br />SUMMARY OF ESTIMATED COSTS FOR SERVICES <br />The estimated costs for performing the above tasks are not to exceed 578,865 without prior approval. <br />Enclosed is an Engineering Fee Estimate with hourly cost breakout. Actual cost will be based on time and <br />materials, in accordance with the attached Engineering Fee Estimate and engineers current Hourly Fee <br />Schedule. The hourly fee schedule will be updated in April of each year. <br />2ls/2o2t <br />S:\DoCS\KCCDU57-16 Whiskey Creek - Ellensburg Water Company Fish Passage lmprovements\Agreement\Scope of Work.docx <br />Anderson Perry & Associates, lnc. <br />Page 3 of 3