My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_HLA TO 1_Kachess Culvert
>
Meetings
>
2021
>
03. March
>
2021-03-16 10:00 AM - Commissioners' Agenda
>
Resolution_HLA TO 1_Kachess Culvert
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 1:45:27 PM
Creation date
3/11/2021 1:45:18 PM
Metadata
Fields
Template:
Meeting
Date
3/16/2021
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
o
Item
Request to Approve a Resolution to Authorize the Director's Signature on HLA Engineering and Surveying, Inc. Task Order #1 - Kachess Road Culvert Replacement Project
Order
15
Placement
Consent Agenda
Row ID
73736
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOARD OF COUNTY COMMISSIONERS <br />COUNTY OF KITTITAS <br />STATE OF WASHINGTON <br />RESOLUTION NO. 2021 - <br />AUTHORIZING THE DIRECTOR OF PUBLIC WORKS TO SIGN TASK ORDER NO. <br />1 WITH HLA ENGINEERING AND SURVEYING, INC. FOR THE FINAL DESIGN OF <br />THE KACHESS ROAD CULVERT REPLACEMENT PROJECT <br />WHEREAS: Public Works has a master Task Order contract in place with HLA Engineering <br />and Surveying Inc. resulting from a solicitation effort from 2020; and <br />WHEREAS: Jacobs Engineering is unable to finalize design of the Kachess Road Culvert <br />Replacement in a timely manner; and <br />WHEREAS: Concerns over the integrity of the existing metal culvert necessitate immediate <br />action finalizing culvert design components; and <br />WHEREAS: Public Works has negotiated a scope of work and fee for HLA Engineering and <br />Surveying, Inc. to complete final design of the needed culvert replacement, <br />NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the <br />best interest of the public, does hereby authorize the Director of Public Works signature on HLA <br />Engineering and Surveying, Inc. Task Order No. 1 for $80,000.00. <br />DATED this 16th day of March 2021, at Ellensburg, Washington. <br />BOARD OF COUNTY COMMISSIONERS <br />KITTITAS COUNTY, WASHINGTON <br />Brett Wachsmith, Chairman <br />Attest: <br />❑ Clerk of the Board- Julie Kjorsvik <br />Laura Osiadacz, Vice -Chairman <br />❑ Deputy Clerk of the Board- Mandy Buchholz <br />Cory Wright, Commissioner <br />
The URL can be used to link to this page
Your browser does not support the video tag.