Laserfiche WebLink
TASK 5 — MANAGEMENT RESERVE <br />This task will be a management reserve budget to be used upon specific request by the Client. The <br />management reserve may be used for Client directed changes, modifications, or additional work items <br />not covered by the existing budget. <br />PROJECT LIMITATIONS AND ASSUMPTIONS <br />This proposal does not include the following but may be added by contract amendment: <br />1. Easements <br />2. KCCD or EWC to provide backhoe excavated test pits <br />3. Kittitas County bridge or roadway modifications <br />4. Individual irrigation system improvements <br />5. Major creek realignment or modifications outside of the current design <br />6. Hydrology modeling and flood routing <br />7. Bidding and construction administration assistance <br />SUMMARY OF ESTIMATED COSTS FOR SERVICES <br />The estimated costs for performingthe above tasks are not to exceed $78,865 without prior approval. <br />Enclosed is an Engineering Fee Estimate with hourly cost breakout. Actual cost will be based on time and <br />materials, in accordance with the attached Engineering Fee Estimate and engineers current Hourly Fee <br />Schedule. The hourly fee schedule will be updated in April of each year. <br />2/5/2021 Anderson Perry & Associates, Inc. <br />5'\D0cs\KCCD\157-16 Wh[skey Creek— Ellensburg Water Company F66 Passage Impr,eements\Agreement\Scope O Workdoa Page 3 of 3 <br />