My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-03-08-minutes-public-works-study-session
>
Meetings
>
2021
>
03. March
>
2021-03-16 10:00 AM - Commissioners' Agenda
>
2021-03-08-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 1:45:19 PM
Creation date
3/11/2021 1:44:09 PM
Metadata
Fields
Template:
Meeting
Date
3/16/2021
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
73736
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Intldstl uctuie for Rebuilding Amei ico (INFRA) Gent <br />Is the project based on the results of preliminary <br />engineering? <br />Does the project contribute to one or more of the <br />following goals: <br />• Safety: To achieve a significant reduction in traffic <br />fatalities and serious injuries on all public roads <br />• Infrastructure condition: To maintain the highway <br />infrastructure asset system in a state of good <br />repair. <br />• Congestion reduction: To achieve a significant <br />reduction in congestion on the National Highway <br />System. <br />• System reliability: To improve the efficiency of the <br />surface transportation system. <br />• Freight movement and economic vitality: To <br />improve the national freight network, strengthen <br />the ability of rural communities to access national <br />and international trade markets, and support <br />regional economic development. <br />• Environmental sustainability: To enhance the <br />performance of the transportation system while <br />protecting and enhancing the natural environment <br />• Reduced project delivery delays: To reduce project <br />costs, promote jobs and the economy, and <br />expedite the movement of people and goods by <br />accelerating project completion through <br />eliminating delays in the project development and <br />delivery process, including reducing regulatory <br />burdens and improving agencies' work practices. <br />State which of the following activities have been <br />completed: <br />• Environmental Assessment <br />• Topographic Surveys <br />• Metes and Bounds Surveys <br />• Geotechnical Investigation <br />• Hydrologic Analysis <br />• Utility Engineering <br />• Traffic Studies <br />• Financial Plans <br />• Revenue Estimates <br />• Hazardous Materials Assessments <br />• General estimates of the types and <br />qualities of materials <br />Other work needed to establish parameters for <br />the final design <br />Specify the Goal(s) and summarize how the <br />project and independent project components <br />contributes to that goal(s). The Department will <br />base its determination on the project's benefits <br />as assessed according to the Economic Vitality <br />criterion. <br />
The URL can be used to link to this page
Your browser does not support the video tag.