My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-02-22-minutes-public-works-study-session
>
Meetings
>
2021
>
03. March
>
2021-03-16 10:00 AM - Commissioners' Agenda
>
2021-02-22-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 1:47:58 PM
Creation date
3/11/2021 1:43:46 PM
Metadata
Fields
Template:
Meeting
Date
3/16/2021
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
73736
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TASK 5 — MANAGEMENT RESERVE <br />This task will be a management reserve budget to be used upon specific request by the Client. The <br />management reserve may be used for Client directed changes, modifications, or additional work items <br />not covered by the existing budget. <br />PROJECT LIMITATIONS AND ASSUMPTIONS <br />This proposal does not include the following but may be added by contract amendment: <br />1. Easements <br />2. KCCD or EWC to provide backhoe excavated test pits <br />3. Kittitas County bridge or roadway modifications <br />4. Individual irrigation system improvements <br />5. Major creek realignment or modifications outside of the current design <br />6. Hydrology modeling and flood routing <br />7. Bidding and construction administration assistance <br />SUMMARY OF ESTIMATED COSTS FOR SERVICES <br />The estimated costs for performing the above tasks are not to exceed $78,855 without prior approval. <br />Enclosed is an Engineering Fee Estimate with hourly cost breakout. Actual cost will be based on time and <br />materials, in accordance with the attached Engineering Fee Estimate and engineers current Hourly Fee <br />Schedule. The hourly fee schedule will be updated in April of each year. <br />2/5/2021 Anderson Perry & Associates, Inc. <br />5:\Docs\KCCD\157-16 Whiskey Creek— Ellensburg Water Company Fish Passage Impmvements\Agreememt\Smpe of Work.dou Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.