My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2021-031
>
Meetings
>
2021
>
03. March
>
2021-03-02 10:00 AM - Commissioners' Agenda
>
Res-2021-031
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2021 11:31:19 AM
Creation date
3/4/2021 11:31:15 AM
Metadata
Fields
Template:
Meeting
Date
3/2/2021
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
o
Item
Request to Approve a Resolution Authorizing the Chair's Signature on the Local Agency Federal Aid Project Prospectus for the Manastash Road Creek Bank Stabilization and Sno-Park Improvement - CRP 273-16
Order
15
Placement
Consent Agenda
Row ID
73221
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency <br />Kittitas Counly Public Works <br />Project Title <br />Mamsash Road Crer:k Sunk Stabilizutinn and Srorv Park Improvement <br />Date <br />21rcnAzl <br />ir'-] No Right of Way Needed <br />* Afl construction required by the <br />contract can be accomplished <br />within the of <br />of Way <br />n Relocation Required <br />il nignt of Way Needed <br />f] t'to Relocation <br />Utilities Railroad <br />il mo utility work required <br />LZJnt *tity work will be cornpleted prior to the start <br />of the construction contraci <br />ilrut.utility work will be completed in coordination <br />with the construction contract <br />[d ruo railroad work required <br />flett raitroad work will be completed prior to the start of <br />the construction coniract <br />[f ntthe railroad work will be completed in coordination <br />with the construction contract <br />Description of Utility Relocation or Adjustments and Existing Major Structures lnvolved in the Project <br />There are existing overhead powerlines and power poles that will need to be moved prior to construction. <br />There is also buried communication lines that may need to be temporarily relocated. Utilities will be moved <br />by the franchisee prior to construction. <br />This project has been by the legislative body the administration agency or agencies, or <br />design ee, and is not inconsistent with the agency'$comprehensive <br />Date 3lzlat BY <br />SOT Form 140-101 <br />Revised O4/2Ol 5 <br />located within 3"2 kilometers miles of the project? flves [7-] t'to <br />FAAlnvolvement <br />ls any a <br />Remarks <br />Nb airports within 2 miles <br />Previous Editions Obsoiote <br />for com opment. <br />Fage 3
The URL can be used to link to this page
Your browser does not support the video tag.