My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment A - Chapter 14 Redline
>
Meetings
>
2021
>
03. March
>
2021-03-02 2:00 PM - 2:00pm Public Hearing
>
Attachment A - Chapter 14 Redline
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2021 1:23:21 PM
Creation date
2/25/2021 1:22:53 PM
Metadata
Fields
Template:
Meeting
Date
3/2/2021
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to Consider Amending KCC Chapter 14.04 and Title 20 to Adopt the 2018 International Building Codes with Washington State Amendments and Referenced Standards and to Consider Amending KCC Title 18 to Correct Grammatical and Scrivener Errors.
Order
1
Placement
2:00pm Public Hearing
Row ID
73229
Type
Hold Public Hearing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. The building permit or copy thereof shall be kept on the site of the work until the completion <br />of the project. <br />3. It shall be the duty of the permit holder or their agent to notify the building official that such <br />work is ready for inspection. It shall be the duty of the person requesting any inspections <br />required by this code to provide safe access to and means for inspection of such work. <br />4. Work shall not be done beyond the point indicated in each successive inspection without <br />first obtaining the approval of the building official. The building official upon notification, <br />shall make the requested inspections and shall either indicate the portion of the construction <br />that is satisfactory as completed, or shall notify the permit holder or an agent of the permit <br />holder wherein the same fails to comply with this code. Any portions that do not comply <br />shall be corrected and such portions shall not be covered or concealed until authorized by <br />the building official. <br />5. No building or structure shall be used or occupied, and no change in the existing occupancy <br />classification of a building or structure or portion thereof shall be made until the building <br />official has issued a certificate of occupancy therefore as provided herein. Issuance of a <br />certificate of occupancy shall not be construed as an approval of a violation of the provisions <br />of this code or of other ordinances of Kittitas County. Certificates presuming to give authority <br />to violate or cancel provisions of this code or other ordinances of Kittitas County shall not be <br />valid. <br />1. Exception: Certificates of occupancy are not required for work exempt from permits. <br />2. Exception: Certificates of occupancy are not required for accessory buildings or <br />structures. (All structures require a final inspection). <br />6. All permits shall expire by limitation and be declared void if any one of the following apply: <br />1. Work is not started within 365 days of obtaining a permit. <br />2. Work is abandoned for 365 days or more after beginning work. <br />3. An inspection and approval of work completed has not been performed by Kittitas <br />County Community Development Services for 365 days. <br />7. The Building Official is authorized to grant one or more extensions, not to exceed 365 days <br />per extension, except, building permits obtained as a result of a Code Enforcement violation <br />may be granted no more than one extension. The extension shall be requested in writing, <br />prior to permit expiration, and justifiable cause shall be demonstrated. Fees for extension <br />shall be established by resolution. <br />8. If a permit has expired, a new permit may be obtained for one-half the amount of the <br />original permit fee(s), plus issuance fees, provided no changes have been made or will be <br />made in the original construction documents for such work, and provided further that the <br />permit was reviewed under the current adopted codes. If the permit is renewed under a <br />previous adopted code cycle, a plan review must be completed and charged at the current <br />full building permit rate. If construction has or, will, deviate from the original permit, a <br />revisions permit must be submitted, approved and issued in addition to renewal of the <br />expired permit. Fees shall be established by resolution. <br />9. The Building Official, or designee, is authorized to perform a final inspection and issue a <br />Certificate of Occupancy on an expired permit, provided that all building inspections have <br />been successfully completed to include Water Metering that has been installed, inspected <br />and approved and Access and Septic approvals have been completedexcept for the final <br />inspection. The Building Official may require a re-inspection fee. A re-inspection fee shall be <br />established by resolution.
The URL can be used to link to this page
Your browser does not support the video tag.