My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res_Manastash Prospectus
>
Meetings
>
2021
>
03. March
>
2021-03-02 10:00 AM - Commissioners' Agenda
>
Res_Manastash Prospectus
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2021 1:21:47 PM
Creation date
2/25/2021 1:21:38 PM
Metadata
Fields
Template:
Meeting
Date
3/2/2021
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
o
Item
Request to Approve a Resolution Authorizing the Chair's Signature on the Local Agency Federal Aid Project Prospectus for the Manastash Road Creek Bank Stabilization and Sno-Park Improvement - CRP 273-16
Order
15
Placement
Consent Agenda
Row ID
73221
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOARD OF COUNTY COMMISSR <br />COUNTY OF KITTITAS <br />STATE OF WASHINGTON <br />RESOLUTION NO. 2021 - <br />AUTHORIZING THE CHAIR'S SIGNATURE ON THE LOCAL AGENCY FEDERAL AID <br />PROJECT PROSPECTUS FOR THE MANASTASH ROAD CREEK BANK STABILIZATION <br />AND SNOW PARK IMPROVEMENT, CRP 273-16 <br />WHEREAS: The Manastash Road realignment and bank stabilization project was requested <br />in 2016 due to a deteriorating roadway and bank erosion resulting from <br />Manastash Creek; and <br />WHEREAS: Kittitas County Public Works submitted for, and was approved for a Federal <br />Lands Access Program (FLAP) Grant for up to $1,332,968.00, with up to <br />$154,169.00 available for preliminary engineering; and <br />WHEREAS: January 5, 2020, a Local Agency Project Prospectus was signed that included an <br />amount that exceeded the Western Federal Lands programmed amount for <br />preliminary engineering with resolution 2021-009. This Project Prospectus has <br />been updated lowering the amount for preliminary engineering and increasing the <br />amount for construction. This Prospectus will replace the one dated January 5th; <br />and <br />WHEREAS: In preparation to starting the preliminary engineering phase Public Works is <br />requesting the Washington State Department of Transportation to release the <br />Federal Funds for design; and <br />WHEREAS: A Local Agency Federal Aid Project Prospectus must be executed by the Chair <br />acknowledging the project has been reviewed and is consistent with the agency's <br />comprehensive plan for community development, and <br />NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best <br />interest of the public, does hereby approve the Chair's signature on the Local <br />Agency Federal Aid Project Prospectus for the Manastash Road Creek Bank <br />Stabilization and Snow Park Improvement, CRP 273-16. <br />DATED on this 2nd day of March 2021, at Ellensburg, Washington. <br />Attest: <br />❑ Clerk of the Board- Julie Kjorsvik <br />BOARD OF COUNTY <br />COMMISSIONERS <br />KITTITAS COUNTY. WASHINGTON <br />Brett Wachsmith, Chairman <br />Laura Osiadacz, Vice -Chairman <br />❑ Deputy Clerk of the Board- Mandy Buchholz <br />Cory Wright, Commissioner <br />
The URL can be used to link to this page
Your browser does not support the video tag.