My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-20-00002 Suncadia Winemaker's Cabins - Master File
>
Meetings
>
2021
>
02. February
>
2021-02-16 2:00 PM - 2:00pm Public Hearing
>
LP-20-00002 Suncadia Winemaker's Cabins - Master File
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2021 1:25:44 PM
Creation date
2/11/2021 1:18:31 PM
Metadata
Fields
Template:
Meeting
Date
2/16/2021
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to consider the Suncadia Winemaker's Cabins Preliminary Plat (LP-20-00002).
Order
1
Placement
2:00pm Public Hearing
Row ID
72795
Type
Hold Public Hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
477
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHBIT J (Rev. 1) to Development Agreement <br />Development Standards and Design Guidelines for <br />MountainStar Master Planned Resort <br />December 2, 2008 <br />Section 4 -Stormwater Management <br />The provisions of Chapter 12.70 KCC. Storm Water Management Standard~ and Guidelines, <br />shall be inapplicable to MountainStar. <br />Drainage plans for MountainStar shall be consistent with the Master Drainage Plan. <br />MountainStar Master Planned Resort, dated April 1999 (Rev. July 1999). Stormwater <br />retention/detention. intiltration and water quality facilities, as required in the Master Drainage <br />Plan, shall be included in the tina! drainage plans for each applicable plat or subdivision. <br />Drainage facility locations will be based on future detailed design studies. <br />The Master Drainage Plan for MountainStar describes in detail the proposed stonmvater runoff <br />and water quality control plans for managing stormwater runoff generated by MountainStar. The <br />facilities planned will be designed to minimize the environmental impact ofthc development on <br />the Cle Elum River. site streams, and groundwater in the area. The stormwater management <br />facilities planned for the resort will be designed to DOE SMM ( 1992) standards, and the <br />requirements and protocols of the Master Drainage Plan. The DOE SMM for Eastern <br />Washington, current addition. shall be used for BMPs as approved by Kittitas County. <br />Goveming documents for the design and construction of MountainStar stormwater facilities shall <br />include the following: <br />>-Master Drainage Plan. MountainStar Master Planned Resort, W&H Pacific. Inc .. April <br />1999 (rev. July 1999). as may be further amended . <br />.., Stonmvater Management Manual for Eastern Washington, Washington State Department <br />of Ecology. current addition. <br />)...-Standard Specifications for Road, Bridge. and Municipal Construction, Washington State <br />Department of Transportation (WSDOn; the Highways and Local Programs, American Public <br />Works Association (APW A) general provisions, latest edition; Kittitas County: and <br />MountainStar Resort Development, LLC standards and specifications. <br />The State standard specifications and plans shall be maintained by the contractor on site during <br />the entire period ofthe construction. Definitions noted as "state·• and "contracting agency" shall <br />be amended to read "owner". <br />The construction of storm drainage facilities shall be done in accordance with plans that have <br />been approved by the County Engineer. Driveway culverts shall be a minimum of 12 inches in <br />diameter or the equivalent. <br />Section 5 -Wastewater Facilities <br />Within the MPR boundaries. the MountainStar Resort Resources. Inc. utility established by <br />Trendwcst will revie\v and approve planning, design and construction documents for \Vastcwater <br />collection and pumping facilities. Governing documents for design and construction of <br />Szmcadia Master Planned Resort Exhibit J-Development Standards <br />8 December 2. 2008 <br />Index #34
The URL can be used to link to this page
Your browser does not support the video tag.