My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-01-25-minutes-public-works-study-session
>
Meetings
>
2021
>
02. February
>
2021-02-16 10:00 AM - Commissioners' Agenda
>
2021-01-25-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2021 1:19:05 PM
Creation date
2/11/2021 1:17:35 PM
Metadata
Fields
Template:
Meeting
Date
2/16/2021
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
72787
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 1 to Amendment 2 — Scope of Work <br />d. Settlement. An engineering evaluation is required to document that loss of freeboard <br />due to long term settlement of the levee is not an issue. This analysis must address <br />embankment loads, compressibility of embankment soils, compressibility of foundation <br />soils, compaction methods, etc. Aspect engineers will complete this assessment using <br />information and data from prior geotechnical reports, which is not expected to be <br />significant issue or effort. <br />e. Interior drainage. An engineering evaluation is required to document that drainage from <br />areas interior to the levee is not a problem (verify that drainage from outside the levee <br />will not pond up and cause flooding problems of its own). Aspect does not expect this to <br />be much of an issue or require significant effort to complete. <br />f. Levee System Operations Plan, Maintenance Plan (OP & MP). These plans must be <br />provided to support the levee certification request. There are specific requirements for <br />each plan and the City may already have an OP & MP for the lower levee. FEMA <br />requires them to be adopted by council and signed by the City Manager. Aspect <br />assumes that the City will put these together. <br />In addition to the above technical reports, a FEMA certifiable connection between the lower <br />Reecer Creek Levee and the 1-90 Reecer Creek Bridge will be needed. Aspect has developed a <br />preliminary concept that involves tying the lower levee into the ecology block floodwall that <br />passes through the bridge along the pedestrian pathway. While the ability to meet all <br />certification requirements at the 1-90 bridge is currently uncertain, Aspect recommends initiating <br />the connection design effort and engaging with FEMA about certification requirements during <br />the process. <br />Scope of Work <br />The Amendment 2 Scope of Work provided below addresses: <br />✓ Amendment 2 Task 1— Complete 90% Design Package for Lower Levee to 1-90 Bridge <br />Connection. <br />✓ Amendment 2 Task 2 — Prepare Final Design Package and Bidding Documents for <br />Lower Levee to 1-90 Bridge Connection. <br />✓ Amendment 2 Task 3 Prepare Levee Technical Report to Support Certification and <br />CLOMR Process. <br />✓ Amendment 2 Task 4 — Additional Coordination with City, County, and FEMA During <br />Design and Levee Certification and CLOMR Processes. <br />✓ Amendment 2 Task 5 — Management Reserve Fund <br />Aspect's project management time is embedded in each task. <br />Amendment 2 Task 1: Complete 90% Design Package for Lower Levee to 1-90 <br />Bridge Connection <br />Aspect will develop a 90% Design Package for the lower levee to 1-90 bridge connection. <br />Aspect's Task 1 services include: <br />Reecer Creek Floodplain Mapping and Levee Certification Support Services Project 2 1 Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.