Laserfiche WebLink
Project plan for Dave ,:,00re irrigation project <br />We are planning on running 1160' of 10" pvc 100# pipe along side Badger Pocket <br />Rd starting from the KRD canal which is 3900' south of the intersection of Thrall <br />Rd and Badger Pocket Rd. It will then turn approximately 45 degrees and headNE <br />through Dave Moore property to an existing pump station point in his field. <br />Kooy's Irrigation will be installing the pipe. Dave Moore will be hiring an excavator <br />company to do the trench work. <br />Currently pvc pipe is hard to get so as soon as the pipe comes in we would like to <br />start digging and installing this pipe line. Our goal is to have it completed by <br />March 31, 2021 <br />We will be laying the pipe in the county ditch with a minimum cover of 30". We <br />will have to dig out the current ditch to get that amount of cover. <br />