cRP# 273-t6:Location:Last Updated:Priority #9Manastash Rd Creek Bank Stabil.ization & Sno-Park ImprovementsManastash Rd, MP 10.7-MP 11.0September 9,2O2OProjectNumber: RC1573-E1Length: 0.30 mitesBasis for Project: Repair and SafetyConstruction: 2O2ZProiect Description: Erosion caused by the South Fork Manastash Creek has caused bank instabil.ity under the county road.The road is currently one lane at this Location. The road wil.L need to be restored and the bank stabitized to provide two Lanes oftraffic. Sno-Park improvements wiil. also be incl.uded during construction.Status: Design phase with construction in ZOZZTraffic Impacts: To be determinedFunding Sources:: Ptanned] FLAP/FHWA, fundsr Local Funds$1,333,000$537,000$1,870,000TotaL:ForUndercutting of bankSno-Park area and barrier cl.osing one lane