CRP 298-L9:Location:Last Updated:Vantage HwyVantage Hwy, MP ?L.25-27.51, VantageSeptember 9, ?O2OPriority #2Project Number: RC1913-RPBasis for Proect: Safety and StructureLength: 6.26 mil.esConstruction: zOZtproiec,l Dencription: An HMA overtay wil.l. be completed on a portion of Vantage Hwy between the truck lane at Mp 21.25 andRecreation Dr. at MP 27.5! to improve the structure of the road to accommodate the highervolumes of traffic as seen in KCpW'sannual traffic studies.and.pavement rating repo{s.. Safety measures wil.l. al.so be compLeted by repl.acing and instal.ting guardrail.where warranted. Other del.ineation such as fl.exibte guide posts wil.l. be instatl.ed as needed. 'Status: DesiTraffic Impacts: To be determinedFunding Sources:RAPfunding$1,259,000HSIPfunding$1,154,000Totat: $2,4!2,OOOn is underway with tentative construction for Summer ZOZ!MP 27_ LOOKING WESTBOUNDa- r.For more information onthis project, contact Daren Case @509-962-7523 orMP 22.8- LOOKING WESTBOUND