Laserfiche WebLink
Project Name: #LI WNC Phase 2Wilson-Naneum-CherryLast Updated: September 30, 2020Basis for Project: Witson-Naneum-Cherry AssessmentSchedute: 2O2O-2OZ1-Project Description:HydroLogic analysis with existing 2-d model to evaluate a potential. Whiskey Creek tie-in at the Reecer Creek F1oodptain project.Evatuate the effects of Mercer Creek flow routing north of the airport on hydrol.ogic regime, determine the design specificationsneeded at proposed raitroad crossing, evatuate the avaitabl.e ftood capacity within Reecer Creek ftoodpl.ain site, and assess water-right considerations downstream of the proposed reroute site.Status: Planned projectFtood rmpacts: Decreased fl.ood risk to the west El.l.ensburg community.Funding. FCZD Levy