Laserfiche WebLink
Kittitas County Capital lmprovement Program January 5,2021 <br />or infrastructure located <br />in hazard-prone areas. <br />Table 1 continued - Six-Year Plan Summary <br />2021-2026 Summary Kittitas Countv Public Facilitv Proiects <br />Proiect Name Location & Desciotion Fundins Source Schedule Total Cost <br />Floodplains By Design <br />Acquisitions <br />Yakima River - Ringer <br />Reach. Acquisition of <br />413 acres ofcontinuous <br />Yakima River <br />floodplain, to facilitate <br />implementation of future <br />flood risk reduction <br />projects and prevent <br />development and <br />associated risk <br />Floodplains by <br />Design 2020-202r $2,950,000 <br />Ringer Reach Property <br />Improvements <br />Yakima River - Ringer <br />Reach. Control for <br />invasive species, riparian <br />buffer plantings, and <br />building <br />decommissioning at <br />County-owned <br />properties that were <br />purchased for fl oodplain <br />conservation and <br />restoration. <br />Yakima Basin <br />Integrated Plan 2021-2024 $550,000 <br />Hanson Pits Restoration <br />Plan and Design <br />Yakima River - Ringer <br />Reach. Technical <br />investigation of potential <br />risks associated with the <br />Hanson Pits and the <br />downstream private <br />berm, and implications <br />for modifications to <br />these structures, habitat <br />restoration goals, and <br />private property and <br />transportation facilities. <br />Yakima Basin <br />Integrated Plan 2021 $102,000 <br />Hanson Pits Restoration <br />Implementation <br />Yakima River - Ringer <br />Reach. Implementation <br />of preferred alternative <br />from Hanson Pits <br />Restoration Plan and <br />Design (FCZD Project <br />#4\. <br />Salmon <br />Recovery <br />Funding Board <br />(potential) <br />2022-2025 $1,280,000 <br />Reecer Creek Dolarway to <br />University <br />Wilson-Nane um-Cherry <br />Subbasin. Flood Control <br />Zone District Cost share <br />in support of City of <br />Ellensburg Project to <br />purchase property, <br />construct setback levees <br />and construct second <br />bridee alone Dolarwav <br />FCZDLevy 2021 TBD <br />Six.Year Plan Page 8