Laserfiche WebLink
project numberCRP #Res. #design (PE)right of wayConstruction Engineering (CE)constructiondesignright of wayConstruction Engineering (CE)constructiondesignright of wayConstruction Engineering (CE)constructiondesignright of wayConstruction Engineering (CE)constructiondesignright of wayConstruction Engineering (CE)constructiondesignright of wayConstruction Engineering (CE)constructionProject TotalAnticipated Construction Advertisement DatePlanned BRACPlanned RAP 10% mtachPlanned HIP /LPPlanned HSIP /LPPlanned FLAP /FHWAPlanned STBG /LPRID IncomeOther GrantsLocal Dollars 2021Local Dollars 2022Local Dollars 2023Local Dollars 2024Local Dollars 2025Local Dollars 2026Road# BMP EMP STIP ImpType Type Advertise <br />CAPITAL IMPROVEMENT PROJECT NAME <br />1 RC1569-B1 270-16 2016-102 12 1252 950 314 <br />28500 6.91 8.64 WA-08820 15 CE <br />Jacobs/J&K Earthworks LLC <br />2 RC1913-RP 298-19 2019-160 100 50 2262 1258 1154 0 <br />94001 21.3 27.5 WA-11932 6 CE <br />3 RC1587-C1 284-18 2018-054 17 1750 73 62 1632 <br />12650 2.3 2.7 WA-11302 6 CE <br />Jacobs/ <br />4 RC2190-G1 303-20 220 220 <br />63500 5.03 6.05 CE <br />County Force Construction <br />5 RC1592-F1 293-18 2018-101 10 600 56 467 87 <br />93041 1.47 1.94 CE <br />Will go to bid <br />6 100 400 500 <br />VARIOUS <br />7 RC2091-HP 302-20 2020-131 220 70 2196 2486 <br />95417 9.36 9.76 WA-12683 47 CE <br />8 RC1594-B1 295-18 2019-163 400 250 500 350 6415 6415 400 250 850 <br />25880 2.84 2.85 WA-12577 6 CE <br />9 Manastash Rd Creek Bank Stab, and Snow Park Impr.RC1573-E1 273-16 2016-099 200 100 70 1500 1333 27 510 <br />95301 10.7 11 WA-12576 6 CE <br />10 RC1583-G1 286-18 2018-054 60 140 200 <br />42512 1.15 1.15 CE <br />local forces <br />11 RC2090-HP 301-20 2020-139 78 78 <br />VARIOUS WA-12682 18 CE <br />12 100 250 303 14 33 <br />VARIOUS <br />13 150 250 346 20 34 <br />22512 <br />14 250 50 254 50 500 118 3129 3631 50 80 590 <br />31510 <br />15 150 32 650 500 20 312 <br />10360 <br />16 275 60 1200 275 1260 <br />23010 <br />17 100 35 700 20 350 500 605 100 <br />68910 0 0.57 WA-11934 15 CE <br />Hungry Junction Road Widening <br />Badger Pocket Orchard Roads Phase 1 61078350400435183215351205791518702001264220 1767 24125002486University and Reecer Intersection Signal (CN) <br />N. Thorp Hwy - Yakima River Bridge <br />Clear Zone Inventory <br />Dickey Creek Bridge Replacement <br />Construction of Licke Creek to start 6/28/2020 $819,864.10 <br />Upgrade gravel road areas to BST. Install private bridge. LOCAL FORCES <br />CN moved to 2021. CN not Obligated <br />Upper County Traffic Calming <br />Design to start 9/2020, possible CN in 2021 <br />Final Contract: $500k inkind match design/survey and $1M Cash for 12.63% match <br />Bar 14 Turnaround <br />Lambert Road Br 06345 Maintenance <br />Clear Zone Improvement Project 2022-23 <br />Yellowstone Culvert Replacement <br />Airport Road Culvert Replacement <br />2024 2026 <br />Kachess Lake Rd Culvert Replacemnt <br />Vantage Hwy <br />Teanaway Rd Hydraulic Improvement <br />Fairview Road Improvement <br />2025 <br />KITTITAS COUNTY <br />2021-2026 <br />SIX YEAR TRANSPORTATION IMPROVEMENT PLAN <br />2021 2022 2023 <br />Study (Safety Program) <br />Safety Program <br />Badger Pocket Road HMA <br />1 of 3