My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021 - 2026 Capital Improvement Program for Adopting Ordinance
>
Meetings
>
2021
>
01. January
>
2021-01-05 10:00 AM - Commissioners' Agenda
>
2021 - 2026 Capital Improvement Program for Adopting Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2021 9:34:30 AM
Creation date
12/31/2020 1:34:13 PM
Metadata
Fields
Template:
Meeting
Date
1/5/2021
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
i
Item
Requesting to Approve an Ordinance Adopting the Kittitas County Capital Improvement Program for the Planning Period 2021-2026
Order
9
Placement
Consent Agenda
Row ID
70983
Type
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 5 <br />Introduction <br />Kittitas County Department of Public Works (KCDPW) provides planning, design and <br />maintenance services to County residents for numerous assets on the County Road and Bridge <br />transportation network. The maintenance division of Public Works controls various assets in the <br />Public Works portfolio such as maintenance facilities (shops) and aggregate pits and quarries. <br />All Road Fund assets are managed within the County’s Equipment Rental and Replacement <br />Fund (Fund 501). <br />Owing to structural damage to the Upper County Shop in 2015 (Cle Elum), the shop is being <br />replaced by a new maintenance facility whose construction completion is anticipated in late <br />2021. The Lower County Shop (Ellensburg) is under increasing pressure from urbanization and <br />discussions are currently underway to relocate the facility to the new Transfer Station (Solid <br />Waste) site on Highway 97. Land acquisition is programmed for 2022. Subsequent project <br />actions are listed in EXHIBIT 1. <br />Current Assets Described <br />Upper County Maintenance Shop (Cle Elum, WA) <br />The existing Upper County Shop is an unreinforced concrete masonry building built in the early <br />1940s. The site is approximately one-half acre in size and booked in the 1940s as being worth <br />approximately $310.00. Building improvements are currently valued at $140,032 +/-. <br />Construction is currently underway on a replacement facility in Cle Elum on Highway 903. The <br />approximate $6 million facility is sited on land purchases in 2018 for $349,766 +/-. KCDPW <br />paid cash for the land and the cost of construction is being underwritten by cash reserves. A <br />schedule of the project is provided in EXHIBIT 1 of this plan along with the anticipated expense <br />plan. A listing of assets for the existing facility is provided as EXHIBIT 2. The existing shop <br />facility will be placed on surplus once final occupancy is issued by the County Building <br />Department. Surplus revenue (sale of the existing Upper County Shop) appears in EXHIBIT 1 <br />as forecast year 2021 ($400,000). <br />Hyak Joint Maintenance Facility with Snoqualmie Pass Utility District <br />KCDPW currently shares a joint maintenance facility with the Snoqualmie Pass Utility District <br />(SPUD). The site is approximately one-quarter acre in size and supports improved paved <br />parking for several vehicles. The building is wood framed and wrapped in metal and <br />approximately 4,000 square feet in size. Current land value is booked at $51,480.50. Paving <br />improvements are valued at $50,829.17. The building is valued at $203,536.57. SPUD is <br />currently planning on significant water and wastewater improvements that will likely impact the <br />existing joint maintenance facility. Discussions are underway that could result in transfer of the <br />County’s interest to SPUD for offsetting use of space in new planned facilities near the existing <br />site. It is premature to forecast any impact to KCDPW at this time. No change in the operational
The URL can be used to link to this page
Your browser does not support the video tag.