Laserfiche WebLink
Kittitas County Capital Improvement Program January 5, 2021 <br /> <br />Six-Year Plan Page 10 <br /> <br /> <br />evaluate the available <br />flood capacity within <br />Reecer Creek floodplain <br />site, and assess water - <br />right considerations <br />downstream of the <br />proposed reroute site. <br />Table 1 continued - Six-Year Plan Summary <br />2021-2026 Summary Kittitas County Public Facility Projects <br />Project Name Location & Description Funding Source Schedule Total Cost <br />WNC Phase 3 <br />Wilson-Naneum-Cherry. <br />Implement capital <br />recommendations from <br />Phase 2 Feasibility <br />Study. <br />FCZD Levy, <br />Flood control <br />assistance <br />account <br />program <br />(potential) <br />2025-2026 $600,000 <br />Reach Assessment (Thorp to <br />Gladmar) <br />Yakima River. <br />Assessment to identify <br />and prioritize flood <br />alleviation and habitat <br />restoration actions in a 4- <br />mile reach of the Yakima <br />River, extending from <br />just upstream of Thorp, <br />to Gladmar Park and the <br />I-90 river crossing. <br />FCZD Levy, <br />Salmon <br />Recovery <br />Funding Board <br />(potential) <br />2023-2024 $104,000 <br />Flow Conveyance <br />Restoration (Site 2) <br />Site to be determined. <br />Implement flow <br />conveyance restoration <br />project that exceeds <br />scope of annual flow <br />conveyance maintenance <br />activities. <br />FCZD Levy, <br />Ecology <br />Centennial <br />Clean Water <br />Grant <br />(potential) <br />2022-2023 $360,000 <br />Flow Conveyance <br />Restoration (Site 3) <br />Site to be determined. <br />Implement flow <br />conveyance restoration <br />project that exceeds <br />scope of annual flow <br />conveyance maintenance <br />activities. <br />FCZD Levy, <br />Ecology <br />Centennial <br />Clean Water <br />Grant <br />(potential) <br />2025-2026 $392,000 <br />Crystal Creek Conveyance <br />Project <br />Site to be determined. <br />Implement Crystal Creek <br />conveyance project <br />identified through <br />current Crystal Creek <br />flood study. <br />Gant funding 2022-2023 $120,000 <br />Manastash Cove Road <br />Replacement <br />Replace existing Cove <br />Road bridge with bridge <br />of sufficient freeboard <br />and span to pass <br />sediment and flood flows <br />FCZD Levy, <br />Flood control <br />assistance <br />account <br />program <br />(potential) <br />2026 $200,000