Laserfiche WebLink
NGantt Chart7 May 202OSchedule andTeam Leader/Planner - Tom Beckwith FAICPGraphic Design - Michael ArthurLandscape Design - Jennifer Kiusalaas ASLA LEEDGIS - Jennifer HackettxIIIIIXweeks I I 12468024tilI Start wayfinding processa Conduct wayfinding retreat2 Create alternative conceptsa Create alternative conceptsb Review concepts with publicc Refine preferred conceptd Validate final designs/costs/methods3 Develop style guides, specificationsa Develop style guides/specifications/costsb Review guides,/costs,/schedulesc Refine guides/costs/methods/fundingd Approve implementation@ Vtilestone meetings, workshops, and events.4024208$ 7,000$4,200$3,s00$ 1,400$0$2 s0$0$2 50$7,000$4,450$ 3, s00$ 1,650$ 19,600$ 1,400$4,200$ 1,400$44,100$ 19,600$ 1,650$4,200$ 1,650$45,3 s0XXXXXXXXXXXXXXXXXXXXXXXI prof6 hours811282482s25%252241l1012765%Iaborco st$ 1,400materialcost$2s0$0$2,400$900$4, s s0totalcost$ 1,6s0SubtotalCoProject budgetSubtotalContingency$0$2 s0$0$250$ r,2 s02687,618$1,250 $47,6182Public Works sign fabrication option1-3 Start, create, develop style guides,/specifications4 Implement wayfinding by public contracta Develop bid documents/review bids X Xb Fabricate river directory by vendor - each Xb Fabricate wayfinding sign by vendor - each X$44,100$4,200$4,200$26,400$90,900$ 169, I 18$8,4s6$48,300$177,573Vendor bid sign fabrication optionProject budget3a Assumes specifications for 10I single-sided wayfinding and 11 double-sided river directory signsDoes not include mounting hardware, posts, or installation.