My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-11-09-minutes-public-works-study-session
>
Meetings
>
2020
>
12. December
>
2020-12-01 10:00 AM - Commissioners' Agenda
>
2020-11-09-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 12:54:07 PM
Creation date
11/25/2020 12:49:27 PM
Metadata
Fields
Template:
Meeting
Date
12/1/2020
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
69627
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7y Flood Damage Reduction Segment / System <br />t t11t, <br />Public Sponsor Pre-Inspection Form <br />US Army Corps <br />of Engineers® <br />The following information is to be provided by the levee district sponsor prior to an inspection. This information will be used to help evaluate the organizational capability of the <br />levee rjkh ict to mansae the levee segment / cvctsm maintenance nrn¢rsm. <br />1. Levee segment/ system and district: (same of the segment/ system and levee district) <br />Klocke for CENWS <br />2. Reporting period: (montWday/year to montldday/year) <br />6/3/2017 to 12/612017 <br />3. Summary of maintenance required by last inspection report: <br />Ve"ition maintenance <br />4, Summary of maintenance performed this reporting period: <br />Vegetation maintenance, collaborate with USACE on levee repair project YAK -4-16 <br />S. Summary of maintenance planned next reporting period: <br />Vegetation maintenance <br />6. Summary of changer to segremt / system since Inst inspection: <br />None <br />7. Problems/ issues requiring the assistance of the US Army Corps of Engineers: <br />Continue to work with USACE on leve repair project YAK4-16 <br />Flood Damage Reduction Segment / System Pre-Inspecdon Form <br />Inspection Report Page 1 of 2 <br />US Army Corps 10ocke (1C1 Q <br />of Engineers® <br />
The URL can be used to link to this page
Your browser does not support the video tag.