My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-10-26-minutes-public-works-study-session
>
Meetings
>
2020
>
11. November
>
2020-11-17 10:00 AM - Commissioners' Agenda
>
2020-10-26-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2020 1:17:55 PM
Creation date
11/12/2020 1:15:40 PM
Metadata
Fields
Template:
Meeting
Date
11/17/2020
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
69003
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Changs Order No, 16 <br />l?rs�ject Nc�. 150�"l�: <br />The dial. desr:gn, will iimIude: a teehruoal me.thorrar lura Outlining the <br />problem stawment and investigatory njohodology, with details describing <br />the construction details, vendor specifications, quality control measures, <br />and input from basin sfakebolder.s. <br />Tom.- —ot#lnnnd Monitoring. Under this task Aspect will; <br />Task 3,1 $7,500: <br />I Condtxt a site inspecdon to document construction of a <br />representative home and sem, includia.g.;cofuation of mew <br />installation (per mw-ufactu r speciftatidn) and locatlons: ? <br />* Conduct. site-mewuroments iiii ae.wrdanao. with design.(Taslc 2); <br />* Take constrwtion .photos and GFS i nmuirements to correwith � <br />parcel. ihforiwiOn. f <br />Vie anticipatethe pilat study to be at least 16 to 14 rttonths to duration. we <br />s agsu thio Counq -A- ill provide the raw t0ranary water rneu-,r c to on a <br />monthly, basis. Aspect will cvalu this data (assurr6 two hours per mbpth): <br />andl Ovide an email status z to includins an estimate of cot sU ptiue <br />uso. The ;upda : will be suitable for distribution to basin -stakeholders. <br />Talc 4 -- Pxepar'atsl of Thncal Regorf, [ l:nx#erltis task Amt will. <br />c€ b1pt% and pratluev a. Whaical report: d0immonting design, construction, <br />i ,and iinplementatio afthe consumptive use pilpt study. "The report will l <br />` conclude:with ars esti-nate of consumptive use and addttionall observation <br />and/or reacornrnendations, as =Wc'd: ToL Promote cost efficiency, <br />[ documentation p oduced under Task 2 Wil1:be directly incorporated into the <br />rqarL A &aftre.port will be provided for early group review. In additi rt, <br />we have budgeted for one meeting with the grog to discuss findings of the <br />:rejort. Following fe.4 lotion o.t any comments, a. teal report wil :bc <br />produced. <br />Thus change amends contract betwom Aspect Consulting, LLC and Client da <br />ASPECT eON€iMTING LLC <br />u 1%arl>�d.ii�tti(v eAm�trr <br />CLIENT <br />By. <br />Printed N100W, inn D. Carlson <br />it : - w . vakima <br />i <br />V 15033Blfit}i#asCm rtty, Cenecpl;PermitTerhni"I. Sj Coft. ump&eWe Plloo.d tax <br />Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.