Laserfiche WebLink
49 CFR Part 26 <br />FiscalYear 2021 <br />For FY-2027, We do not anticipate an award for FY-2021 <br />FiscalYear 2022 <br />For FY-2022,We anticipate an award of the following for FY-2022 <br />FiscalYear 2023 <br />For FY-2023, We anticipate the award of the following at Bowers Field <br />Revised: Feb. 12,2019 <br />Contract Name Trade Description NAICS Description NAICS Trade ($)Census DBE <br />Directory <br />DBE (W <br />DBE ($) <br />(= Trade <br />$xDBE <br />%) <br />No Project <br />Anticipated <br />Total Contract <br />Total FY- 2021 <br />Contract Name Trade Description NAICS Description NAlCS Trade ($)Census DBE <br />Directory <br />DBE (W <br />DBE ($) <br />(= Trade <br />$x DBE <br />%) <br />Wetland <br />Mitigation for EA <br />Projects - Design <br />Engineering Services Engineering Services 541330 $ I 75,000 864 l5 1.7%82,97s <br />Environmental Services Environmental Services i41620 $175,000 197 3l 15.7%i24,47s <br />Total Contract $350,000 1061 t6 4.3% <br />Total FY- 2021 $3s0,000 l06l +6 +.3%130,450 <br />Contract Name Trade Description NAICS Desciption /v4/cs Trade ($)Census DBE <br />Directory <br />DBE (%) <br />DBE ($) <br />(= Trade <br />$x DBE <br />%) <br />Wetland <br />Mitigation for EA <br />Projects - <br />Construction and <br />Land Acquisition <br />Engineering Services Sngineering Services 14 1 330 $l 50,000 864 15 r.7%$2,550 <br />HWY, Street, and <br />Bridee Construction <br />HWY, Street, and <br />Bridse Construction <br />137310 $2,250,000 9l 2 >-.2Vo $49,500 <br />lffices of Real Estate <br />{ppraisers <br />Offices of Real Estate <br />Aooraisers <br />t31320 $s0,000 350 0 0%$0 <br />Total Controct $2,450,000 1305 t7 13%$ <br />Total FY- 2023 $2,450,000 1305 l7 l.3o/o $52,050