My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Airport Staff Report DBE and Supporting Documents
>
Meetings
>
2020
>
11. November
>
2020-11-03 10:00 AM - Commissioners' Agenda
>
Airport Staff Report DBE and Supporting Documents
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 1:53:48 PM
Creation date
10/29/2020 1:53:23 PM
Metadata
Fields
Template:
Meeting
Date
11/3/2020
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
j
Item
Request to Approve a Resolution Authorizing Signature on the DBE (Disadvantaged Business Enterprise) Plan for Bowers Field
Order
10
Placement
Consent Agenda
Row ID
68283
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
49 CFR Part 26 Revised: Feb. 12,2019 <br />Base Figure = [(Total FY-2021 DBE%)+(Total FY-2022 DBE%)+(Total FY-2023 DBE%)]/[3 Years) <br /> <br />Base Figure = (0.0%+4.3%+1.3%)/3 Years = 1.9% of all firms ready, willing and able. <br /> <br />The data source or demonstratable evidence used to derive the numerator was: <br />http://omwbe.wa.gov/gov/directory-of-certified-firms/ <br />The data source or demonstratable evidence used to derive the denominator was: <br />http://www.census.gov/cedsi/ <br /> <br />Step 2. 26.45(d): Adjustments to Step 1 base figure. <br /> <br />There is no historical DBE data to reference to make an adjustment to the Step 1 base figure; <br />therefore, the Airport is adopting its Step 1 base figure as its overall goal for this three-year goal <br />period. <br /> <br />Breakout of Estimated “Race and Gender Neutral” (RN) and “Race and Gender <br />Conscious” (RC) Participation. 26.51(b) (1-9) <br /> <br />The recipient will meet the maximum feasible portion of its overall goal by using RN means of <br />facilitating DBE participation. <br /> <br />Examples <br />1. Arranging solicitations, times for the presentation of bids, quantities, specifications, <br />and delivery schedules in ways that facilitates DBE, and other small businesses, <br />participation; <br />2. Providing assistance in overcoming limitations such as inability to obtain bonding or <br />financing; <br />3. Providing technical assistance and other services; <br />4. Carrying out information and communications programs on contracting procedures <br />and specific contract opportunities; <br />5. Implementing a supportive services program to develop and improve immediate and <br />long-term business management, record keeping, and financial and accounting <br />capability for DBE’s and other small businesses; <br />6. Providing services to help DBE’s and other small businesses improve long-term <br />development, increase opportunities to participate in a variety of kinds of work, handle <br />increasingly significant projects, and achieve eventual self-sufficiency; <br />7. Establishing a program to assist new, start-up firms, particularly in fields in which DBE <br />participation has historically been low; <br />8. Ensuring distribution of DBE directory, through print and electronic means, to the <br />widest feasible universe of potential prime contractors; <br />9. Assist DBE’s and other small businesses, to develop their capability to utilize emerging <br />technology and conduct business through electronic media; and <br />10. (Include other race neutral measures as appropriate)
The URL can be used to link to this page
Your browser does not support the video tag.