My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_LAG_KPG_VantageHwy
>
Meetings
>
2020
>
11. November
>
2020-11-03 10:00 AM - Commissioners' Agenda
>
Resolution_LAG_KPG_VantageHwy
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 1:54:48 PM
Creation date
10/29/2020 1:52:54 PM
Metadata
Fields
Template:
Meeting
Date
11/3/2020
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
t
Item
Request to Approve a Resolution to Award a Local Agency Agreement to KPF, P.S.for the Design and Environmental Permitting for the Pavement and Guardrail Replacement on Vantage Highway MP 21.25 - MP 27.51; CRP 298-19
Order
20
Placement
Consent Agenda
Row ID
68283
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vantage Highway Reconstruction Project Cultural Resource Survey Price Proposal <br />4 If cultural resources are located during this project, further work, investigation, or analysis <br />may be required to evaluate whether the resource(s) is/are eligible for inclusion on the <br />National Register of Historic Places; this survey could result in a recommendation for <br />professional archaeological monitoring during excavation activities at project execution or <br />other additional work; any such additional work, investigation, evaluation, or analysis is not <br />included in this price proposal. <br />4.1 This proposal does not include the inventory or formal National Register of Historic <br />Places (NRHP) evaluation of any buildings, bridges, or other structures near the project <br />area whose evaluation may be requested by interested or other parties. <br />5 An email describing the findings of the field investigation will be sent to Joseph Howard, P.E. <br />of KPG within five working days of completion of the field work. The correspondence will <br />include preliminary recommendations regarding project monitoring or any other suggestions <br />for additional work. <br />5.1 An electronic draft copy of the report in Portable Document Format (PDF) will be <br />provided to KPG within twenty working days of completion of the field work. <br />5.2 Any review and comment upon the draft report will be provided to PIateau within thirty <br />days of receiving the draft report. <br />5.3 Plateau will upload the final report to the DAHP's WISAARD portal, and provide contact <br />information to request a review of the documentation. Since the submittal process varies <br />by funding and permitting agency, Plateau will assist with submissions and verify that <br />the reports are submitted with all appropriate cover sheets and/or exhibits. <br />6 KPG agrees to provide any of the following that are available or possible: <br />6.1 All available correspondence related to cultural resources from or to the funding or <br />permitting agency, DAHP, or any other interested parties. <br />6.2 The most current set of project plans, preferably in an electronic format. <br />6.3 Geographic Information System (GTS) data for the project. <br />6.4 Inclusion of Plateau's logo on the construction sign for the project. <br />Plateau Archaeological Investigations 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.