Laserfiche WebLink
A, <br />Millington Staft <br />w De�90' at Tranqxiftafian <br />June 26, 2020 <br />HWA GeoSciences, Inc. <br />21312 30th Drive SE, Suite 110 <br />Bothell, WA 98021 <br />Subject: Acceptance FYE 2019 ICR — CPA Report <br />Dear Vasil y Babko: <br />Development Division <br />Contract S"ce's office <br />PO Box 47408 <br />Olympia., WA 98504-7408 <br />7345 Underson Way SW <br />Tumwater, WA 98501-6504 <br />TTr I -BOD -833-6368 <br />www.wsdat.wa.gov <br />We have accepted your firms FYE 2019 Indirect Cost Rate (ICR) of 194.86% of direct <br />labor (rate includes 0.41 % Facilities Capital Cost of Money) based on the "Independent <br />CPA Report," prepared by T -MAX CPA. This rate will be applicable for WSDOT <br />Agreements and Local Agency Contracts in Washington only. This rate may be subject <br />to additional review if considered necessary by WSDOT. Your ICR must be updated on <br />an annual basis. <br />Costs billed to agreements/contracts will still be subject to audit of actual costs, based <br />on the terms and conditions of the respective agreement/contract. <br />This was not a cognizant review. Any other entity contracting with the firm is <br />responsible for determining the acceptability of the ICR. <br />If you have any questions, feel free to contact our office at (360) 705-7019 or via email <br />consultantrates(a)wsdot.wa.sov. <br />Regards; <br />ERIK K. JONSON <br />Contract Services Manager <br />EKJ:ah <br />