My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_LAG_KPG_VantageHwy
>
Meetings
>
2020
>
11. November
>
2020-11-03 10:00 AM - Commissioners' Agenda
>
Resolution_LAG_KPG_VantageHwy
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 1:54:48 PM
Creation date
10/29/2020 1:52:54 PM
Metadata
Fields
Template:
Meeting
Date
11/3/2020
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
t
Item
Request to Approve a Resolution to Award a Local Agency Agreement to KPF, P.S.for the Design and Environmental Permitting for the Pavement and Guardrail Replacement on Vantage Highway MP 21.25 - MP 27.51; CRP 298-19
Order
20
Placement
Consent Agenda
Row ID
68283
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KPG <br />TASK 613 — FINAL DESIGN (GUARDRAIL REPLACEMENT AND UPGRADE) <br />Objective: Develop final project design for the Vantage Highway guardrail replacement and <br />upgrade including construction plans, specifications, and cost estimate. Perform the design <br />congruent with pavement repair and overlay design, permit requirements and the <br />recommendations of the geotechnical report. <br />Consultant Responsibilities: <br />I. Participate in design coordination meetings with the County. Prepare agendas, figures, <br />meeting minutes and other exhibits as necessary. Assumes up to two coordination meetings. <br />2. Coordinate with utility owners within the project area. it is anticipated that the utilities may <br />include Consolidated Communications, Kittitas County PUD and Puget Sound Electric. <br />3. Prepare a 90% Review Submittal for review and approval by the County. The 90% submittal <br />will incorporate review comments and build upon the 30% submittal and will include, at a <br />minimum, the following (for plans that are common between Task 6A and Task 6B, one <br />plan will be prepared for both tasks): <br />a. Plans <br />i. Survey Basemap <br />ii. Typical Sections <br />iii. Guardrail Plans and Details <br />iv. Site Preparation Plans <br />V. Site Restoration Plans <br />vi. Miscellaneous Details <br />vii. Traffic Control Plans <br />b. Specifications <br />c. Construction Cost Estimate <br />d. internal QA/QC review <br />4. Prepare a Pre -Bid Review Submittal for review and approval by the County. The Pre -Bid <br />submittal will incorporate review comments and build upon the 90% submittal and will <br />include, at a minimum, the following (for plans that are common between Task 6A and <br />Task 6B, one plan will be prepared for both tasks): <br />a. Plans <br />i. Survey Basemap <br />ii. Typical Sections <br />iii. Guardrail Plans and Details <br />iv. Site Preparation Plans <br />V. Site Restoration Plans <br />vi. Miscellaneous Details <br />vii. Traffic Control Plans <br />b. Specifications <br />c. Construction Cost Estimate <br />Page 13 <br />23 Wenatchee Ave, Suite 223, Wenatchee, WA 98801 P; 509.663.2711 www.kpq.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.