My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_LAG_KPG_VantageHwy
>
Meetings
>
2020
>
11. November
>
2020-11-03 10:00 AM - Commissioners' Agenda
>
Resolution_LAG_KPG_VantageHwy
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 1:54:48 PM
Creation date
10/29/2020 1:52:54 PM
Metadata
Fields
Template:
Meeting
Date
11/3/2020
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
t
Item
Request to Approve a Resolution to Award a Local Agency Agreement to KPF, P.S.for the Design and Environmental Permitting for the Pavement and Guardrail Replacement on Vantage Highway MP 21.25 - MP 27.51; CRP 298-19
Order
20
Placement
Consent Agenda
Row ID
68283
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Local Agency ASE Professional Services <br />Negotiated Hourly Rate Consultant Agreement <br />Agreement Number: <br />Firm/Organization Legal Name (do not use dba's): <br />KPG, P.S. <br />Address <br />Federal Aid Number <br />23 S Wenatchee Ave, Ste 223, Wenatchee WA 98801 <br />Preparation and Delivery of EIectronic Engineering and Other Data <br />UBI Number <br />Federal TIN <br />601-248-468 <br />91-1477622 <br />Execution Date <br />Completion Date <br />November 3, 2020 <br />December 31, 2022 <br />1099 Form Required <br />Federal Participation i <br />❑ Yes © No <br />■❑ Yes ❑ No <br />Project Title <br />Vantage Highway Pavement and Guardrail Replacement <br />Description of Work i <br />KPG will provide design and environmental permitting for pavement and guardrail replacement on <br />Vantage Highway MP 21.25 to MP 27.51. Project tasks include: pavement design utilization reinforcing i <br />fiber material, replacement of all existing guardrail for T-31 compliance and associated system <br />improvements as required, such as relocated drainage or other impacted existing infra -structure, less <br />franchised utilities. KPG will utilize County supplied survey providing the basis of the design work. <br />❑■ Yes ❑ No DBE Participation Maximum Amount Payable: $248,995.00 <br />❑ Yes R No MBE Participation Management Reserve $100,000 <br />❑ Yes ❑■ No WBE Participation Total $348,995 i <br />❑ Y ■❑ No SBE Participation <br />Index of Exhibits <br />Exhibit A <br />Scope of Work <br />Exhibit B <br />DBE Participation <br />Exhibit C <br />Preparation and Delivery of EIectronic Engineering and Other Data <br />Exhibit D <br />Prime Consultant Cost Computations <br />Exhibit E <br />Sub -consultant Cost Computations <br />Exhibit F <br />Title VI Assurances <br />Exhibit G <br />Certification Documents <br />Exhibit H Liability Insurance Increase <br />Exhibit I Alleged Consultant Design Error Procedures <br />Exhibit J Consultant Claim Procedures <br />Local Agency A&E Professional Services <br />Negotiated Hourly Rate Consultant Agreement Revised 0110112020 <br />Agreement Number <br />Page I of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.