My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_LAG_KPG_VantageHwy
>
Meetings
>
2020
>
11. November
>
2020-11-03 10:00 AM - Commissioners' Agenda
>
Resolution_LAG_KPG_VantageHwy
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 1:54:48 PM
Creation date
10/29/2020 1:52:54 PM
Metadata
Fields
Template:
Meeting
Date
11/3/2020
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
t
Item
Request to Approve a Resolution to Award a Local Agency Agreement to KPF, P.S.for the Design and Environmental Permitting for the Pavement and Guardrail Replacement on Vantage Highway MP 21.25 - MP 27.51; CRP 298-19
Order
20
Placement
Consent Agenda
Row ID
68283
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MIPOF <br />e. WSDOT Bid Document Approval Coordination <br />5. Prepare Bid Documents. The Bid Documents will incorporate review comments from the <br />Pre -Bid review and will include, at a minimum, the following (for plans that are common <br />between Task 6A and Task 613, one plan will be prepared for both tasks): <br />a. Plans <br />L Survey Basemap <br />ii. Typical Sections <br />iii. Paving Plans and Details <br />iv. Site Preparation Plans <br />V. Site Restoration Plans <br />vi. Miscellaneous Details <br />vii. Traffic Control Plans <br />b. Specifications <br />c. Construction Cost Estimate <br />d. Internal QA/QC review <br />Assumptions: <br />1. Roadway design will be in accordance with the Kittitas County Code, WSDOT Design Manual, <br />AASHTO guidelines, and MUTCD standards as applicable. Where conflicts exist between <br />standards, the County will provide direction or request the Consultant's recommendation. <br />2. Drafting and plan productions will be completed using KPG standards. <br />3. Project specifications will be based on the most recent edition of the 2021 WSDOT Standard <br />Specifications for Road, Bridge, and Municipal Construction. <br />4. KPG will coordinate with utility owners to identify existing utilities and incorporate into the <br />design as/if required. No utility relocations are anticipated but if needed, will be designed <br />and constructed by the utility owner. <br />5. The project does not require a drainage report and is not included in this scope of work. <br />6. The project does not include design of pedestrian surfaces or ADA compliant pedestrian <br />access routes. <br />7. This scope of work does not include attendance or facilitation of public meetings or hearings. <br />8. No Right -of -Way acquisition or permanent easements are required or are included within <br />this scope of work. <br />County Responsibilities: <br />1. The County will assist KPG in coordinating with utility owners as needed to facilitate timely <br />input and responses. <br />2. Provide comments and guidance to KPG for each design deliverable which will form the <br />basis for development of each subsequent submittal. <br />Page 11 <br />23 Wenatchee Ave, Suite 223, Wenatchee, WA 98801 P: 509.663.2711 www.kpg.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.